Air Curtain Incinerator FAQ — 455 Questions, Answered

Plain-language answers on how air curtain incinerators work, what they can burn, what drives throughput and how costs compare with hauling or grinding. Shopping for equipment? Browse our air curtain incinerators for sale.

Air curtain burner and excavator burning land-clearing debris

455 questions in 10 sections. Section 1 is open; select any question to read its answer.

1
Section 1 · Questions 1–20

The Basics

20 questions
1

What is an Air Curtain Incinerator?

An air curtain incinerator (ACI) is a high-capacity combustion system designed to process permitted wood and vegetative debris. A powerful blower directs a controlled sheet of air across a firebox or trench, improving combustion and helping keep smoke and embers within the burn area. ACIs are commonly used for land clearing, forestry, storm cleanup, and wood-waste management.
2

How does an Air Curtain Incinerator work?

An engine- or motor-driven blower forces air through a manifold along the chamber, creating a high-velocity air curtain over the fire. Wood is loaded into the chamber and burns under the directed airflow. Correct startup, fuel loading, and maintenance are essential to achieve efficient combustion and control visible emissions.
3

Why would I use an Air Curtain Incinerator instead of hauling, grinding, chipping, or landfilling my debris?

The primary reason I recommend burning over grinding is the significant difference in volume reduction and disposal costs. Grinding an entire tree typically reduces its original volume by approximately 50%, leaving a substantial amount of material that may still need to be transported and disposed of. In contrast, burning can reduce wood debris volume by approximately 95% to 98%, leaving very little residual material. The financial difference is equally significant. Hauling and disposing of a 20-cubic-yard dump truck load of debris can cost approximately $500 to $1,000. Using an air curtain incinerator, that same volume of material can be burned for an estimated $20 to $25 in direct operating costs. The result is a potential savings of $475 to $980 per 20-cubic-yard load, while nearly eliminating the need to haul debris off-site. An ACI can dramatically reduce the volume of eligible wood debris at or near the project site, reducing the number of loads that must be transported and disposed of. Unlike grinding or chipping, the objective is destruction rather than creating a reusable product. The best choice depends on permits, debris quality, haul distance, tipping fees, reusable wood value, and site conditions.
4

How much money can an Air Curtain Incinerator save me?

Below you will find a description of how to save money and some formulas you can use to calculate the answer for your situation. Savings depend on avoided trucking, disposal or processing costs minus machine rental, delivery, fuel, labor, support equipment, permits, and ash management. For high-volume projects with long hauls or expensive tipping fees, the difference can be substantial. Burn Debris can create a project-specific comparison instead of relying on a generic savings percentage. Burning wood debris on-site with an Air Curtain Incinerator (ACI) can produce substantial savings compared to hauling and landfill disposal. For example, a project containing 20,000 cubic yards of wood debris would require 1,000 dump truck loads at 20 cubic yards per load (20,000 ÷ 20 = 1,000). Assuming each load weighs 6 tons and landfill tipping fees average $45 per ton, disposal would cost $270 per load (6 × $45), totaling $270,000 (1,000 × $270). At an estimated trucking rate of $140 per hour and a two-hour round trip, transportation would add $280 per load (2 × $140), or $280,000 for the project, bringing the total hauling and disposal cost to $550,000, or $27.50 per cubic yard. Alternatively, an ACI processing an average of 62.5 cubic yards per hour, within a typical operating range of 50–75 cubic yards per hour, could process the same material in approximately 320 operating hours (20,000 ÷ 62.5). Estimated burning expenses include $14,000 for two 28-day rental periods (2 × $7,000), $6,240 for diesel (320 hours × 3 gallons × $6.50), $11,200 for operator labor (320 × $35), $4,000 for delivery and pickup, $1,000 for permits, and $3,000 for ash management. These expenses total $39,440, or $1.97 per cubic yard ($39,440 ÷ 20,000), excluding support equipment. Comparing the two methods, on-site burning would save approximately $510,560 ($550,000 − $39,440), representing a 92.8% reduction in estimated disposal costs. Burning can also reduce the original wood debris volume by approximately 95%–98%, greatly minimizing the amount of material remaining for disposal. Actual savings depend on local hauling rates, disposal fees, material characteristics, equipment productivity, and operating conditions. Burn Debris can prepare a project-specific estimate to help customers determine their potential savings. Core Savings Formula: Total Savings = Traditional Hauling & Landfill Cost - On-Site Burning Cost Traditional Hauling & Disposal Cost: • Total Loads = Total Wood Volume (cu yds) ÷ Truck Capacity (cu yds) • Tipping Cost = Total Loads × (Tons per Load × Landfill Fee per Ton) • Trucking Cost = Total Loads × (Round-Trip Hours × Truck Hourly Rate) • Total Haul Cost = Tipping Cost + Trucking Cost On-Site Burning Cost: • Operating Hours = Total Wood Volume (cu yds) ÷ Burn Rate (cu yds per hour) • Fuel Cost = Operating Hours × Gallons per Hour × Fuel Price per Gallon • Labor Cost = Operating Hours × Operator Hourly Wage • Fixed Costs = Machine Rental + Delivery/Pickup + Permits + Ash Management + Support Equipment • Total Burn Cost = Fuel Cost + Labor Cost + Fixed Costs Per-Unit Savings: • Savings per Cubic Yard = (Total Haul Cost ÷ Total Wood Volume) - (Total Burn Cost ÷ Total Wood Volume)
5

How much material can an Air Curtain Incinerator process per hour, day, week, and month?

Throughput varies widely with machine model, moisture, wood size, loading method, and operator practices. As a planning example—not a guarantee—an S327 firebox is a 63 cubic yard capacity. If you did a project burning mixed wood waste limbs, trunks and stumps that material typically burns at 75 cubic yards per operating hour would process roughly 750 cubic yards in 10 active hours, or 3,750 cubic yards over five such days. Larger machines can process considerably more under favorable conditions; ask Burn Debris for a model-specific estimate. Air Burners manufactures three primary sizes of stationary and skid-steered FireBox units: the **100 Series** (e.g., S116 / S119), the **200 Series** (e.g., S220 / S223), and the **300 Series** (e.g., S327 / S330). --- ### Baseline Assumptions & Conversion Rates * **Conversion factor:** $1\text{ ton} = 7.14\text{ cubic yards}$ * **Operating schedule:** * **Day:** 8 operating hours * **Week:** 5 operating days (40 hours) * **Month:** 4 weeks / 20 operating days (160 hours) --- ### 1. Air Burners S100 Series (S-119 / S-116) * **Manufacturer Throughput:** **3–5 tons/hour** (Midpoint average: **4 tons/hour**) | Period | Runtime | Tons Processed | Volume Processed ($7.14\text{ yd}^3/\text{ton}$) | | --- | --- | --- | --- | | **Hour** | 1 hr | 3 – 5 tons *(avg. 4)* | **21.4 – 35.7 yd³** *(avg. 28.6 yd³)* | | **Day** | 8 hrs | 24 – 40 tons *(avg. 32)* | **171.4 – 285.6 yd³** *(avg. 228.5 yd³)* | | **Week** | 40 hrs | 120 – 200 tons *(avg. 160)* | **856.8 – 1,428.0 yd³** *(avg. 1,142.4 yd³)* | | **Month** | 160 hrs | 480 – 800 tons *(avg. 640)* | **3,427.2 – 5,712.0 yd³** *(avg. 4,569.6 yd³)* | --- ### 2. Air Burners S200 Series (S-220 / S-223) * **Manufacturer Throughput:** **5–7 tons/hour** (Midpoint average: **6 tons/hour**) | Period | Runtime | Tons Processed | Volume Processed ($7.14\text{ yd}^3/\text{ton}$) | **Hour** | 1 hr | 5 – 7 tons *(avg. 6)* | **35.7 – 50.0 yd³** *(avg. 42.8 yd³)* | | **Day** | 8 hrs | 40 – 56 tons *(avg. 48)* | **285.6 – 399.8 yd³** *(avg. 342.7 yd³)* | | **Week** | 40 hrs | 200 – 280 tons *(avg. 240)* | **1,428.0 – 1,999.2 yd³** *(avg. 1,713.6 yd³)* | | **Month** | 160 hrs | 800 – 1,120 tons *(avg. 960)* | **5,712.0 – 7,996.8 yd³** *(avg. 6,854.4 yd³)* | --- ### 3. Air Burners S300 Series (S-327 / S-330) * **Manufacturer Throughput:** **9–13 tons/hour** (Midpoint average: **11 tons/hour**) | Period | Runtime | Tons Processed | Volume Processed ($7.14\text{ yd}^3/\text{ton}$) | | --- | --- | --- | --- | | **Hour** | 1 hr | 9 – 13 tons *(avg. 11)* | **64.3 – 92.8 yd³** *(avg. 78.5 yd³)* | | **Day** | 8 hrs | 72 – 104 tons *(avg. 88)* | **514.1 – 742.6 yd³** *(avg. 628.3 yd³)* | | **Week** | 40 hrs | 360 – 520 tons *(avg. 440)* | **2,570.4 – 3,712.8 yd³** *(avg. 3,141.6 yd³)* | | **Month** | 160 hrs | 1,440 – 2,080 tons *(avg. 1,760)* | **10,281.6 – 14,851.2 yd³** *(avg. 12,566.4 yd³)* | --- ### Side-by-Side Average Processing Comparison | Machine Size | Hourly Avg | Daily Avg (8 hrs) | Weekly Avg (40 hrs) | Monthly Avg (160 hrs) | | --- | --- | --- | --- | --- | | **S100 Series** | 28.6 yd³ (4 t) | 228.5 yd³ (32 t) | 1,142.4 yd³ (160 t) | 4,569.6 yd³ (640 t) | | **S200 Series** | 42.8 yd³ (6 t) | 342.7 yd³ (48 t) | 1,713.6 yd³ (240 t) | 6,854.4 yd³ (960 t) | | **S300 Series** | 78.5 yd³ (11 t) | 628.3 yd³ (88 t) | 3,141.6 yd³ (440 t) | 12,566.4 yd³ (1,760 t) |
6

What types of material can I burn in an Air Curtain Incinerator?

From trees to animal carcasses to prevent the spread of disease. Typical candidates include untreated tree limbs, trunks, brush, forestry residues, and other eligible wood or yard waste, subject to the equipment manual and governing permit. Regulations differentiate wood waste, yard waste, and clean lumber. Painted or chemically treated wood, mixed garbage, plastics, and hazardous waste should not be assumed acceptable.
7

Can an Air Curtain Incinerator burn freshly cut green trees?

Yes, ACIs can process freshly cut green trees. The facts are 90% of the time the material burned are freshly cut trees from land clearing projects. While it is true that high moisture absorbs heat and can lower throughput and increase visible smoke, particularly during startup. But once you get the fire to operational temperature the smoke clears in seconds. I would say the average time it takes to clear smoke is about 26 seconds. Combining wet loads with suitable drier material and maintaining a hot fire greatly improves results.

8

How smokeless is an Air Curtain Incinerator?

Well-operated ACIs can generate 95% less visible smoke than an uncontrolled open debris pile, especially once the fire reaches steady-state conditions. They are not literally smokeless: startup, wet loads, overloading, and poor airflow can produce visible emissions. Permit opacity limits apply to many units; no fixed percentage of smoke reduction should be promised for every site. The reality is that it has more to do with if you feed the fire to fast. Feed it slow and steady and there will be almost no smoke.
9

Is an Air Curtain Incinerator the same thing as an Air Curtain Burner?

Generally, yes. The industry is all over the place with what they call these machines. They are even called destructors. They all use a curtain of air that blows on the fire. Air curtain incinerator, air curtain burner, firebox burner, and sometimes air burner are commonly used industry terms, although the underlying machines may differ. The most important distinction is whether the machine uses an above-ground refractory firebox or a trench/open pit configuration.
10

Is an Air Curtain Incinerator considered open burning?

When getting permits you have to understand that government agencies vary the language they use. Some call it open burning and some do not. In the real world getting a permit or approval to use one of these machines comes down to asking your fire marshal how they want it referred to. An ACI operates over an open-topped combustion chamber, but it is a defined category of incineration equipment rather than an uncontrolled open debris pile. A regulator may classify or permit ACI activity differently from traditional open burning. Always check the applicable state and local rules before operating.
11

What is the difference between an Air Curtain Incinerator and simply burning a debris pile?

The main thing is the temperature and the curtain. The higher temperature burns the smoke and the curtain helps to hit the larger flyaway pieces back into the fire making them smaller and less likely to cause fires. Fires are still possible but rare if you follow the instructions. A debris pile burns with uncontrolled ambient airflow and is more susceptible to incomplete combustion and smoke. An ACI uses a mechanically generated air curtain and a defined combustion chamber to improve burning conditions and contain much of the combustion activity. Neither method is automatically exempt from environmental or fire restrictions.
12

What does the “air curtain” actually do?

The blower sends a high-speed stream across the top of the chamber, which recirculates hot gases and helps supply oxygen to the fire. It can retain heat and reduce the escape of smoke and embers when correctly adjusted. It is an airflow system, not a physical lid or complete emissions filter.
13

Why does the high-velocity air reduce smoke?

Smoke often contains particles and gases from incomplete combustion. The directed airflow helps mix those gases with oxygen and hot combustion products, promoting further burning before they escape. Overloading, inappropriate material, or improper airflow can still create smoke. The number one reason that creates a lot of smoke is filling the pit above the air curtain.
14

How hot does an Air Curtain Incinerator burn?

Fire temperatures are variable, not a fixed machine specification. A hot, established wood fire may reach temperatures well above 1,000°F in parts of the combustion zone, while temperatures near walls, ash, and incoming wet loads are different. Operators should use manufacturer instructions and approved instrumentation rather than assume one uniform temperature.
15

How quickly does it reach operating temperature?

If you start your fire using hay bails with about 3/4 of a gallon of diesel per bail. one every 3 feet you can be at full operating temp in 20 to 40 minutes. The time depends on dry starter fuel, weather, moisture, loading technique, and model. Expect a startup period during which the fire and refractory heat up and smoke may be more visible. Follow the manufacturer’s startup sequence and any permit restrictions; Burn Debris can discuss expected startup practices for the actual machine.
16

What happens inside the burn chamber?

Wood is heated to 1500 to 1800 degrees. This is very hot and very fast because wood ignites at 450 to 550 degrees. The burning wood releases combustible gases, forms char, and then burns down to ash and other residues. The blower continuously shapes airflow over the chamber to support combustion. Larger or wetter pieces typically require more time than small, dry material.
17

Why does an Air Curtain Incinerator burn wood faster than an open pile?

Airflow, oxygen mixing, retained heat, and consistent feeding can sustain more intense combustion than an uncontrolled pile. If you have ever fanned the flames of a fire then you know how the fire burns faster when it gets more air. So imagine taking a truck engine connecting it to a fan and then blowing it on a fire. That is why its fast. Actual results depend on wood size and moisture, operator proficiency, and whether the chamber stays within its recommended loading range. ACI performance should be compared using equivalent material and operating time.
18

How much does the original debris volume decrease after burning?

Wood debris can shrink dramatically as combustible material is converted into gases, heat, and ash. For some projects, reductions approaching 95% or more by loose volume may be observed, but this is not a universal guarantee and should not be confused with weight reduction. The result depends on the starting material and how volumes are measured. Example 1: Land Clearing Slash & Orchard Prunings (The Ideal High-Reduction Scenario)Starting Material: Uncompacted, twisted tree branches, brush, and limbs piled with an excavator.Loose Volume vs. Weight: Because of branch angles, the pile is over 80% empty air. A massive 1,000 cubic yard loose pile might weigh only 70 to 80 tons. WOOD DEBRIS VOLUME VS. WEIGHT REDUCTION EXAMPLES ================================================== CORE CONCEPT: Wood debris shrinks dramatically as combustible material is converted into gases, heat, and ash. For some projects, reductions approaching 95% or more by loose volume may be observed, but this is not a universal guarantee and should not be confused with weight reduction. The result depends on the starting material and how volumes are measured. -------------------------------------------------- EXAMPLE 1: Land Clearing Slash & Orchard Prunings (The Ideal High-Reduction Scenario) -------------------------------------------------- * Starting Material: Uncompacted, twisted tree branches, brush, and limbs piled with an excavator. * Loose Volume vs. Weight: Because of branch angles and irregular shapes, the pile is over 80% empty void space (air). A massive 1,000 cubic yard loose pile might weigh only 70 to 80 tons. * Combustion Dynamics: Clean woody slash has a very low natural mineral/ash content (typically 1% to 2%). In an Air Curtain Incinerator (ACI), the cellulose and lignin convert almost entirely into water vapor and carbon dioxide gases. * Operational Result: - Loose Volume: Drops from 1,000 cu yd to 20-30 cu yd of fine ash (~97% to 98% volume reduction). - Weight: Drops from 75 tons to ~1.5 tons (~98% weight reduction). * Takeaway: When loose piles are dominated by open air gaps and clean vegetative wood, loose volume reduction frequently reaches or exceeds 95%. -------------------------------------------------- EXAMPLE 2: Hardwood Root Balls with Embedded Soil (The Heavy Mineral & Density Trap) -------------------------------------------------- * Starting Material: Large-diameter hardwood logs combined with excavated stump root wads encrusted with dirt, clay, and gravel. * Loose Volume vs. Weight: The starting pile has a much higher solid density and lower void ratio. A 500 cubic yard pile of dense logs and root wads often weighs 250+ tons. * Combustion Dynamics: The pure wood fiber combusts into gas, but the dirt, rocks, and non-combustible soil minerals inside the root balls cannot burn. They drop into the burn chamber and remain as solid residue. * Operational Result: - Loose Volume: Drops from 500 cu yd to 40-50 cu yd of heavy, dirt-laden ash and clinkers (~90% to 92% volume reduction). - Weight: Drops from 250 tons to 35-45 tons of residual soil and ash (~82% to 85% weight reduction). * Takeaway: Non-combustible inorganics (dirt, rocks, clay) cannot convert to gas. Even though the wood fiber burns, soil contamination prevents volume and weight reduction from reaching peak theoretical numbers. -------------------------------------------------- EXAMPLE 3: Dense Chipped Wood vs. Loose Brush (The Measurement Baseline Problem) -------------------------------------------------- * Starting Material: 100 tons of the exact same timber processed two different ways before measurement: - Scenario A (Raw Loose Slash): Occupies ~700 cubic yards due to large branch air voids. - Scenario B (Tub-Ground Wood Chips): Mechanically fractured and compacted, occupying ~250 cubic yards. * Combustion Dynamics: Both piles contain identical dry wood mass. When fully combusted, both produce the exact same physical leftover: roughly 10 cubic yards (about 1.5 to 2 tons) of ash. * Operational Result: - Scenario A (Loose Brush): 700 cu yd -> 10 cu yd (~98.5% volume reduction). - Scenario B (Chipped Wood): 250 cu yd -> 10 cu yd (~96.0% volume reduction). - Weight Reduction for Both: Identical at ~98%. * Takeaway: A high percentage of loose volume reduction often reflects how much empty air was in the pre-burn pile rather than additional mass destruction. Measuring loose, uncompacted volume magnifies apparent shrinkage compared to measuring chipped or tightly packed material.
19

How much ash remains?

There is typically 2% to 5% ash left over. Ash quantity depends on species, bark, dirt, mineral content, and incoming contamination. Clean wood leaves a comparatively small mineral residue, while dirty stumps and soil-covered material can leave considerably more. Plan for ash handling and approved disposal rather than assuming no residue.
20

What are the primary advantages of air-curtain burning?

it reduces hauling by 95%. For example if you are looking at a $30,000 hauling bill, the ability to reduce that to $5,000 / $10,000 is a good reason to burn the waste. So, the main advantages can include processing substantial wood-debris volumes near the source, reducing trucking and disposal demand, reducing visible smoke relative to open-pile burning, and shortening cleanup schedules. Disadvantages include permits, fuel, equipment, trained staff, site safety requirements, and the loss of potentially recoverable biomass.
2
Section 2 · Questions 21–48

What You Can and Can't Burn

28 questions
21

What materials are legally and technically suitable for burning?

Material must satisfy both the manufacturer’s specifications and the site's current permits. Federal rules identify categories including wood waste, clean lumber, and yard waste for certain ACI provisions, but local restrictions may be narrower. Verify whether material is untreated, uncontaminated, and appropriate before it enters the burner.
22

Can I burn trees?

Yes, trees are made of wood. LOL. Any plant material can burn. Trees are a common ACI feedstock where permitted. For best production, organize the trees by size, remove prohibited contamination, and use a machine sized for the volume and largest pieces.
23

Can I burn whole trees?

Basically you cut big tree into pieces that will fit in the 20' to 40' pit. Often, yes, if the tree physically fits the combustion chamber and can be handled safely. Large crowns, root balls, and long stems may need cutting or repositioning. The operator must not load material above the manufacturer's allowable height.
24

Can I burn tree trunks?

Yes, tree trunks are routinely burned. Diameter, length, density, and moisture strongly affect how quickly they burn. You can burn logs from 5' to 8' diameter, but its better to spit or shear the log. A machine sized for brush alone may not be the best choice for large hardwood stems.
25

Can I burn large logs?

Many ACIs can burn large logs, but the burn time increases substantially with diameter. You can burn on average 20 foot to 40 foot logs. Oversized pieces may need to be cut or positioned to maintain airflow and avoid protruding above the chamber. Ask for a recommendation based on the largest log diameter and length.
26

Can I burn branches and brush?

Yes, branches and brush are common and typically ignite faster than large logs. Feed them at a steady rate and avoid dumping large, tightly packed loads that restrict air movement or create sudden smoke. Branches can burn at about 50% to 100% faster than other debris. For example I have seen a S300 burn 100 to 125 cubic yards an hour. This is faster than normal material.
27

Can I burn stumps?

Stumps may be suitable when untreated and permitted, but attached dirt, rocks, and moisture slow combustion and increase cleanout. Reduce excess soil before loading and verify that the machine can accommodate their dimensions.
28

Can I burn root balls?

Some root balls can be processed, but they are challenging because they frequently contain soil, rock, and moisture. Remove as much dirt as practical and follow manufacturer and permit limitations. A material-heavy root ball may require preprocessing. Shearing the root ball will save you 75% of your burn time.
29

Can I burn storm-damaged trees?

Yes, clean vegetative storm debris is a common ACI application. You will see these machines commonly on FEMA and Army Corp of Engineer projects. We have countless municipalities using them for storm debris. Sort out fencing, metal, household waste, treated building materials, and other contaminants before burning. Disaster-related authorizations do not automatically eliminate all permit requirements.
30

Can I burn hurricane debris?

Clean trees, branches, and qualifying vegetation from hurricanes may be processed using properly permitted machines. Mixed hurricane debris must be sorted because flood-damaged building materials, plastics, chemicals, and trash may not qualify. Mobilization and site layout are especially important for high-volume operations.
31

Can I burn tornado debris?

Yes, we have lots of clients burning tornado debris. We can burn 400,000 cubic yards per month. Suitable vegetative tornado debris can be processed. Because tornado debris may contain roofing, insulation, wire, and household materials, screening and sorting are essential. Consult the local authority for emergency operating requirements.
32

Can I burn forestry debris?

Yes, untreated slash, limbs, and other eligible forestry residues are common uses. Production depends on the amount of dirt, moisture, and woody material size. Some forest locations also have heightened fire-prevention and seasonal restrictions. This is a common application for wild fire prevention.
33

Can I burn land-clearing debris?

This is the number one use for air curtain burners. Yes, eligible trees, limbs, brush, and stumps from land clearing can often be burned where permitted. Plan the project around clearing pace, hauling distance within the site, excavator availability, and air-quality restrictions.
34

Can I burn orchard or agricultural wood waste?

Yes you can and the T24 or T26 is specifically designed for this. Orchard trees and agricultural woody residues may be acceptable, but verify contamination from stakes, plastic ties, wires, or chemical treatments and confirm the permitted feedstock. Some agricultural wastes are regulated differently from ordinary tree debris.
35

Can I burn clean pallets?

Pallets burn SUPER FAST. You need to confirm the pallets qualify as permitted clean, untreated lumber are typically allowed material. Painted, treated, contaminated, or mixed-material pallets should not be burned without explicit regulatory approval. Local permits may prohibit pallet burning even when federal definitions appear to allow clean lumber.
36

Can I burn untreated dimensional lumber?

Clean, untreated lumber may qualify under some applicable federal ACI provisions, subject to state/local restrictions and the permit. Remove fasteners and any coatings or contamination as required by the operator's material-acceptance policy.
37

Can I burn demolition wood?

Do not assume demolition wood is acceptable. It can contain treated lumber, paint, glues, engineered products, insulation, or other contaminants and may be classified differently from clean wood waste. Burn only material expressly approved by regulators and the machine manufacturer.
38

Can I burn wet wood?

Yes, many machines can burn wet untreated wood, but excessive moisture reduces effective heat and often lowers production. Start with suitable dry fuel as prescribed and feed wet material gradually into an established hot fire.
39

Can I burn wood immediately after it is cut?

Yes, that is one of the practical advantages of properly operated ACIs. The extra heat helps burn of the moisture. Freshly cut wood typically contains more water than seasoned material, so expected throughput should reflect species, size, and moisture.
40

How does moisture content affect production?

Moisture uses combustion heat to evaporate water before the wood can burn effectively. More moisture generally means slower burn rates, more fuel needed for startup, and greater smoke risk if the fire cools. It should be included in all throughput estimates. Moisture Level (Wet Basis)Material ExamplesThroughput Impact (% of Rated Capacity)Burn CharacteristicsLow (<20%)Seasoned slash, dry pallets, deadfall, kiln scrap100% – 110% (Peak rate)Rapid flame propagation; bright, high-temperature bed; minimal smoke; fast feeding intervals.Moderate (20% – 40%)Freshly cut softwoods (pine, fir), mixed clearing aged 2–4 weeks75% – 90%Standard rated throughput; requires steady loading to avoid smothering the bed.High (40% – 55%)Green hardwoods (oak, hickory), fresh storm debris, spring brush50% – 70%Noticeably slower; long dry-out phase inside the box; requires larger base coals.Extreme (>55%)Waterlogged timber, swamp clearing, fresh palms, root wads30% – 50%Severe throughput reduction; high risk of quenching the fire; auxiliary diesel or dry starter fuel needed.
41

What happens when I burn extremely wet material?

An extremely wet load can cool the combustion zone and produce steam and visible smoke while burning slowly. Maintain a hot fire and use smaller, controlled additions within the equipment's instructions; avoid flooding the chamber with wet feedstock.
42

Does muddy material or dirt-covered root material affect burning?

Yes. Soil and stones do not contribute useful heat, increase ash/residue, and can obstruct loading and clean out. Separate or knock off excess soil before burning whenever practical and permitted. This slows burning down a lot. Keep the material as clean as possible.
43

What materials should never be placed in the machine?

Unless expressly authorized for a specific unit and permit, exclude tires, plastics, garbage, hazardous waste, liquid fuels, pressure-treated wood, painted wood, chemicals, batteries, and mixed demolition trash. Maintain a material-inspection procedure before loading. Federal eligibility for particular clean wood categories is not permission for all waste.
44

Can treated lumber be burned?

Generally, treated lumber should not be burned in a standard wood-debris ACI. Preservatives and other treatments can introduce pollutants and place the material outside eligible clean-wood categories. Use an authorized disposal or recycling route. You need to speak to local officials. Fire will burn treated wood but the question is should you burn it?
45

Can painted wood be burned?

Painted wood should not be assumed eligible and is generally excluded from clean lumber. Old coatings may contain toxic substances. Obtain specific regulatory approval before considering any coated or processed wood.
46

Can garbage or municipal solid waste be burned?

A wood-debris ACI is not a general-purpose garbage incinerator. Burning municipal solid waste can trigger very different legal requirements and may be prohibited by the machine's authorization. Keep household trash and mixed waste out.
47

Can plastics, tires, chemicals, or hazardous materials be burned?

No, not in an ordinary clean wood/vegetative-debris ACI operation. Such materials create substantial safety and emissions concerns and are outside the typical authorized feedstock. Follow appropriate hazardous and solid-waste management rules.
48

Do prohibited materials differ by state or permit?

Yes. Federal rules provide an overarching framework, but state and local requirements and the individual permit can be stricter. The specific site's authorized feedstock list—not a general FAQ—controls what may actually be burned. Call BurnDebris.com if you need help.
3
Section 3 · Questions 49–70

Production and Throughput

22 questions
49

How many tons per hour can the machine burn?

Average 8 ton to 10 tons per hour. Throughput depends on machine model, wood species, moisture, dimensions, and how consistently the operator feeds the chamber. Provide the estimated wood type and condition for a credible tonnage range. Call William at the office if you need help.
50

How many cubic yards per hour can it process?

Burn Debris discusses job-specific ranges, including approximately 20 loose cubic yards per hour for some S220 planning cases and around 75–100 loose cubic yards per hour for some favorable S327 applications. These are scenario estimates, not certified rates or minimum guarantees. Large logs, wet wood, and difficult handling can materially reduce output.
51

How many acres of land-clearing debris can I process per day?

We find 0.9 to 2 acres per day as an average. If I was estimating a job I would use 1 acre per day. There is no universal acres-per-day figure: debris per acre depends on tree density, stem diameter, terrain, and whether wood is removed for sale. First estimate cubic yards of suitable debris per acre, then divide by the expected daily throughput. Burn Debris can help develop the estimate for a specific site.
52

How many cubic yards can it process in a 10-hour workday?

Multiply expected operating throughput by actual productive burn hours, not simply the shift length. For illustration, 20 cubic yards per hour for eight productive hours equals approximately 160 cubic yards; at 75 cubic yards per hour it equals about 600. Startup, repositioning, refueling, and cleanout reduce net production time.
53

How many cubic yards can it process in a month?

Multiply realistic hourly throughput by productive hours per day and operating days in the month. For example, 20 cubic yards/hour × 9 productive hours/day × 20 days = about 3,600 loose cubic yards. Actual output should include downtime and material variability.
54

How many truckloads of debris does that represent?

Divide the loose debris volume processed by the usable cubic-yard capacity of the specific truck or container. At 20 cubic yards per truckload, 100 cubic yards/hour equates to five nominal loads/hour. Truck packing, weight limits, and actual loading volumes can change the result. Figure 7.14 cubic yards per hour per ton of burning capacity. • For an S220 the Chamber Turnover Ratio is: ~1.01 cubic yards burned per hour per cubic yard of capacity (0.82 to 1.18 yd³/hr per yd³ capacity) or and average do 1.5 to 2 dump truck loads. For the S327 • Chamber Turnover Ratio: ~1.13 to 1.25 cubic yards burned per hour per cubic yard of capacity (1.02 to 1.48 yd³/hr per yd³ capacity) or 4 to 5 average dump truck loads per hour.
55

Is the advertised burn rate a maximum or a realistic working production rate?

A manufacturer's quoted maximum or a favorable demonstration rate should not be treated as an everyday guarantee. For quoting, use expected project conditions and separate a best-case peak rate from a conservative working rate. Burn Debris can help size equipment with practical production assumptions.
56

What conditions determine actual production?

The major factors are machine size, wood diameter and species, moisture, contamination, blower condition, loading equipment, operator technique, weather, and time lost to cleanout or service. The bottleneck is sometimes material handling rather than combustion.
57

How much does green wood reduce production?

Maybe 20% to 30% if it was bone dry. But the facts are people don't wait. Cut the tree, strike a match, get the job over with and collect the check. Most people burn the trees same day or within a week of cutting them. You can freshly cut trees with water in them, the main thing is to get fire hot and feed it small amounts to keep it hot. Many people are cutting the trees and waiting a few days or weeks before they are ready to burn. There is no reliable universal percentage: most waste is burned green, freshly cut softwood branches and waterlogged hardwood logs behave very differently. Greater moisture generally reduces heat available for combustion and extends burn time. Use a field test or conservative estimate rather than promising a fixed deduction.
58

How much does material size affect production?

Small branches have more surface area relative to their volume and often burn faster. Large-diameter trunks and stumps remain in the chamber longer and can limit the rate of new material loading. A mixed-size feed can help sustain the fire, if loaded properly. For best results slip it to 15" diameter or less. Below 8" diameter burns really fast. Size can make a 50% to 100% difference in time.
59

Do large logs burn slower than brush?

Usually, yes. Large logs take longer for heat to penetrate, dry, and consume the interior wood. They are often the limiting factor when estimating throughput for land-clearing projects.
60

How do stumps affect production?

Stumps can burn slowly due to dense root structure, moisture, and trapped dirt. They also increase ash and cleanout demands. A project with many large stumps should be quoted differently from brush-only debris.
61

Does continuously feeding the machine increase production?

Consistent, measured feeding generally supports steady output, but overfeeding can cool the fire, impede airflow, and create smoke. The goal is to feed at the rate the existing fire can consume the material while respecting loading-height limits.
62

How often should material be loaded?

There is no fixed interval suitable for all models and feedstocks. The operator should observe chamber conditions, residual fuel, and smoke, then add manageable loads as instructed by the manufacturer. A dedicated feeder can improve consistency on high-volume sites. Ultimately, if its smoking wait for smoke to clear. That how to know when to load it. That can be seconds or minutes. We offer support to help you figure this out on your jobs. So if you are experiencing high smoke volumes exceeding the opacity limits (how thick the smoke appears in the air) call us we will help you. I would load in 24" layers of loose material. Call BurnDebris.com if you need more details.
63

Can the machine operate continuously throughout the workday?

You will find most areas allow the burning and hour after sunrise and before sundown. Obviously you have to ask the local officials. Many commercial ACIs are intended for extended daily operation when properly fueled, monitored, and maintained. Operations must respect the manufacturer's duty cycle, permit hours, weather restrictions, and safe ash/cleanout practices.
64

Can it operate 24 hours a day?

Only when the specific equipment, staffing, site, and permits authorize it. Continuous combustion needs around-the-clock trained supervision, fuel, fire protection, and ash-management planning. Do not assume 24-hour loading is permissible. Ask your fire marshal. Some times a state of emergency loosens restrictions. The machine can run 24 hour but you need to check the oil and water levels and monitor the engine temp and oil pressure. research the safe way to do the inspections engines are hot and you can be burned.
65

How long does it take to burn down at the end of a shift?

Burn-down time varies with how much material remains, the size of the wood, and the machine. Large trunks or stumps may continue burning much longer than brush. Stop feeding early enough to complete the manufacturer's shutdown procedures and permit obligations.
66

How much material can Burn Debris’s fleet process during a large disaster response?

Fleet capacity is about 675,000 up to 1,300,000 cubic yards per month depending on the working hours. You could use 2000 cubic yards to 3000 cubic yards per hour. We have participated in disasters for about 30 years. If there is a need we will rise to meet it. Ultimately it depends on the number and models of machines actually available, transport distances, staffing, fuel, and site permits. Total theoretical daily volume is the sum of each deployed machine's realistic production, not simply fleet count multiplied by a peak figure. Contact Burn Debris for a time- and location-specific mobilization plan.
67

How do I calculate the number of machines required for my project?

BurrnDebris.com has a custom built estimation system that we can use to help you analyze a job or your entire business volume and answer this question more thoroughly. It take about 10 to 20 minutes to do a free analysis. Ask for William at BurnDebris.com. Basically you divide the total eligible loose-debris volume by the realistic total productive cubic yards one machine can handle before the deadline, then round up. Machines will vary from 500 to 800 cubic yards per day per machine per 10 hour shift. For example, 50,000 cubic yards ÷ (500 cubic yards/day × 20 days) = five machines before contingency. Adjust for access, shifts, permit limits, uptime, and support-equipment constraints.
68

If I tell you my debris volume and deadline, can you calculate the machine requirement?

Yes. BurrnDebris.com has a custom built estimation system that we can use to help you analyze a job or your entire business volume and answer this question more thoroughly. It take about 10 to 20 minutes to do a free analysis. Ask for William at BurnDebris.com. Provide the estimated volume, project location, target completion date, types and sizes of wood, and work hours allowed. Burn Debris can estimate required machines and supporting equipment using conservative rather than peak production assumptions.
69

What machine would I need to process a specific tonnage or cubic-yard target?

Start with target daily production, the material's size/moisture, and what equipment can feed the burner. Then match these requirements against the capacity and configuration of available machines. A high-volume site with large logs may justify a larger box burner or multiple units. figure 1.6 cubic yards per hour per cubic yard capacity of the box. Ask William Lombardo for help he knows. Call BurnDebris.com
70

When does it make sense to operate multiple machines simultaneously?

Any time you need time compression. Lets say you have a job that would take 4 weeks but you need it in 1 week. Use 4 machines. An excavator can feed 4 machines at a time if you set them up properly. You must place them with space between them so the operator can move away from the heat. But 3 or 4 machines per excavator ratio is excellent. I can run an analysis for you so you can see the comparison. You can cut your cost by 50% to 75% easily. Multiple machines make sense when one machine cannot meet the deadline, where trucks or excavators can keep several units fed, or when separate debris piles make one central site inefficient. Check spacing, fire safety, permits, site layout, and whether each unit must receive a separate authorization.
4
Section 4 · Questions 71–93

Costs and Economics

23 questions
71

What does it cost per ton to dispose of debris with an Air Curtain Incinerator?

DIRECT ACI OPERATIONAL COST PER TON (For Cubic yard rate see What does it cost per cubic yard to dispose of debris with an Air Curtain Incinerator?) (Excludes Mobilization, Permitting, and Support Loading Equipment) • ACI Rental / Depreciation: $2.00 – $4.00 / ton ($7,000–$10,000 per 28-day period) • Diesel Fuel (Blower Engine): $1.50 – $3.00 / ton (3–4 gal/hr @ $3.50–$5.50/gal) • Direct Operator Labor: $3.50 – $6.00 / ton ($30–$45/hr at 6–10 t/hr burn rate) • Ash Management: $0.50 – $1.50 / ton (on-site spreading/incorporation) TOTAL DIRECT OPERATING COST: $7.50 – $14.50 PER TON Divide total project cost by the actual tons processed, including mobilization, rental or ownership, labor, diesel, support equipment, permits, ash disposal, and demobilization. Cost per ton can look high on small projects and much lower when a machine is utilized steadily. We can prepare a project-specific estimate.
72

What does it cost per cubic yard?

Use total all-in project costs divided by measured loose cubic yards processed. DIRECT ACI OPERATIONAL COST PER CUBIC YARD (Conversion Rate: 7.14 Cubic Yards per Ton | Excludes Mobilization, Permitting, and Support Loading Equipment) • ACI Rental / Depreciation: $0.28 – $0.56 / cu yd (derived from $2.00 – $4.00 / ton) • Diesel Fuel (Blower Engine): $0.21 – $0.42 / cu yd (derived from $1.50 – $3.00 / ton) • Direct Operator Labor: $0.49 – $0.84 / cu yd (derived from $3.50 – $6.00 / ton) • Ash Management: $0.07 – $0.21 / cu yd (derived from $0.50 – $1.50 / ton) TOTAL DIRECT OPERATING COST: $1.05 – $2.03 PER CUBIC YARD For example, a $13,000 all-in project that processes 5,000 cubic yards averages $2.60 per cubic yard. This is an illustration, not a Burn Debris price quotation.
73

How does the cost compare with hauling the debris away?

COST COMPARISON: ON-SITE ACI BURNING VS. TRUCKING & LANDFILL DISPOSAL 1. DIRECT UNIT COST BENCHMARKS (at 7.14 cu yds / ton): • On-Site ACI Direct Operating Cost: $1.05 – $2.03 per cubic yard ($7.50 – $14.50/ton) • On-Site ACI Fully Burdened Cost: $2.20 – $4.50 per cubic yard ($15.70 – $32.00/ton) (Includes ACI rental, fuel, operator, mobilization, permits, and ash management) • Off-Site Trucking & Landfill Cost: $10.00 – $35.00+ per cubic yard ($70.00 – $250.00+/ton) (Includes truck loading, round-trip haul hours, scale queueing, and tipping fees) 2. 20,000 CUBIC YARD PROJECT SCENARIO (2,801 TONS / 667 TRUCK LOADS): • Short Haul (1 hr round-trip + $40/ton tipping fee): - Hauling & Landfill Total: $205,420 ($10.27 / cu yd) - On-Site ACI Burning Total: $48,500 ($2.43 / cu yd) - Net On-Site Savings: $156,920 (76% reduction) • Medium Haul (2.5 hr round-trip + $60/ton tipping fee): - Hauling & Landfill Total: $401,510 ($20.08 / cu yd) - On-Site ACI Burning Total: $48,500 ($2.43 / cu yd) - Net On-Site Savings: $353,010 (88% reduction) • Long Haul (4.0 hr round-trip + $85/ton tipping fee): - Hauling & Landfill Total: $611,605 ($30.58 / cu yd) - On-Site ACI Burning Total: $48,500 ($2.43 / cu yd) - Net On-Site Savings: $563,105 (92% reduction) 3. ECONOMIC & LOGISTICAL DRIVERS: • Factors Favoring On-Site Burning: - Round-trip haul times exceeding 1.5 hours - Landfill/transfer station tipping fees above $40/ton - High volume of loose, unground brush and root wads - Jobs exceeding 2,000 cubic yards • Constraints Favoring Off-Site Trucking: - Small volume projects (<1,500 cubic yards) where mobilization costs dominate - Strict air quality non-attainment zones, Red Flag warnings, or burn moratoriums - Inadequate setback distance (typically requiring 250–500 ft from structures/roads) - Soft, swampy, or restricted ground incapable of supporting delivery low-boys Compare the complete cost of onsite burning with container/truck loading, trucking cycles, fuel, labor, tipping fees, and unloading at the receiving site. Longer hauling distances and higher disposal prices tend to favor onsite processing. Site permits or access limitations can change that conclusion.
74

How does it compare with grinding?

GRINDING VS. AIR CURTAIN INCINERATOR (ACI) COMPARISON Grinding creates a product that may have value or require removal, while ACI burning reduces eligible debris to a small amount of ash. Compare grinding equipment, wear parts, trucking of chips, disposal or sale revenue, and site constraints against ACI costs. Wood that has commercial biomass or mulch value may be better processed instead of burned. 1. DIRECT OPERATING & EQUIPMENT COSTS: • Equipment Capital: - Horizontal Grinder (700-1,050 HP): $750,000 – $1,250,000+ ($25k–$45k/mo rental) - ACI Burner (S200/S300 Series): $120,000 – $220,000 ($7k–$10k/mo rental) • Fuel Consumption: - Grinder: 22 to 32 gallons/hr of diesel ($80–$140/operating hr) - ACI: 2.5 to 4.5 gallons/hr of diesel ($10–$22/operating hr) • Consumable Wear Parts: - Grinder: $2.50 – $6.00+ per ton (carbide teeth, hammer tips, screens, belts) - ACI: <$0.25 per ton (no high-speed moving knives or screens) • Direct Processing Cost (excluding freight): - Grinding: $12.00 – $22.00 per ton ($1.70 – $3.10 / cu yd) - ACI Burning: $7.50 – $14.50 per ton ($1.05 – $2.03 / cu yd) 2. LOGISTICS & MATERIAL HANDLING: • Grinding Output: - 100% of material mass remains as wood chips. - A 2,800-ton job leaves ~7,500 cubic yards of chips requiring 75+ walking-floor semi-loads or ~280 dump truck loads to move off-site. • ACI Output: - 95%–98% volume reduction. - The same 2,800-ton job leaves only 70–100 cubic yards of residual ash, easily spread on-site or removed in 3 to 4 truckloads. 3. MARKET & REVENUE EVALUATION: • Grinding Wins If: - High-grade, clean wood feedstock. - Local buyers (mulch yards, pellet mills, bio-energy) pay $25+/ton delivered. - Delivery haul is under 25 miles. • ACI Burning Wins If: - Mixed brush, limbs, tops, or dirt-encrusted root wads. - No local biomass market (or disposal facilities charge tipping fees on chips). - Hauling chips off-site would add $15–$30+/ton in trucking costs. 4. SITE CONSTRAINTS: • Grinding Advantages: No burn bans, no smoke/opacity permits, operates in urban zones. • ACI Advantages: Handles dirt/rock without broken teeth; eliminates highway truck traffic.
75

How does it compare with chipping?

Chipping may be a good option when small branches are clean and there is an economical market or use for chips. ACIs can be advantageous for mixed-diameter woody material with limited reuse opportunities, subject to permits. Pricing needs to include the ultimate destination of both the chips and the ash. CHIPPING VS. AIR CURTAIN INCINERATOR (ACI): LIFECYCLE DECISION GUIDE 1. FEEDSTOCK PROFILES: • Chipping / Grinding: - Acceptable option for: Clean limbs, pruned branches, uniform slash under 18 inches. - Critical Limit: Dirty root wads, gravel, and large-diameter trunk wood dull chipper knives and cause rapid wear parts failure. • Air Curtain Incinerators (ACI): - Best for: Any wood, especially mixed diameters, crooked tops, logs, stumps, and root balls. - Advantage: Rocks, dirt, and heavy soil do not damage cutting components; they drop to the bottom and are cleared with ash. 2. MASS BALANCE & END-DESTINATION LOGISTICS: • Chipping Output (100% Mass Retention): - Produces 3.0 to 3.5 cubic yards of chips per ton. - Must have a planned endpoint: * Sale to biomass/mulch plant ($15–$35/ton revenue delivered). * Broadcast on-site for slope stabilization / erosion control. * Landfill or compost facility tip fee ($20–$55/ton liability). - Hauling expense compounds at roughly $0.25–$0.40 per ton-mile. • ACI Output (95%–98% Volume Reduction): - Produces only 0.05 to 0.15 cubic yards of ash per ton. - Ash Destination: * Spread on-site as carbon-rich biochar and natural soil conditioner. * Minimal off-site haul (a multi-week job fits in 3 to 4 dump trucks). 3. REGULATORY AND PERMIT CONSIDERATIONS: • Chipping: Operates with zero burn permits, zero smoke restrictions, and unrestricted setbacks; ideal for urban interface and strict non-attainment zones. • ACI: Highly cost-effective on bulky and mixed waste, but requires local burn/air permits, weather monitoring, and typical buffer setbacks of 250–500 ft. 4. DECISION RULE: • Choose Chipping if you have a local buyer, wood is clean, small-diameter, and or on-site ground cover need that absorbs the volume without highway freight. • Choose ACI no matter the natural wood material or if material is dirty, mixed-diameter, has zero commercial market, and site permits allow on-site thermal reduction.
76

How does it compare with landfill or tipping fees?

Calculate incoming debris volume or tonnage, landfill tipping charges, trucking, and any sorting costs. Air-curtain burning can avoid transporting most of the original wood volume to disposal, but the remaining ash still requires approved management. Disposal rules and landfill rates vary by location. DEBRIS DISPOSAL & ASH MANAGEMENT COST ACCOUNTING MODEL 1. CORE FORMULAS: • Inbound Tonnage = Total Volume (cu yds) ÷ Density Factor (typically 7.14 cy/ton) • Total Truck Loads = Inbound Tonnage ÷ Truck Payload Capacity (tons) • Trucking Expense = Total Loads × (Round-Trip Travel Hours × Truck Hourly Rate) • Landfill Gate Cost = Inbound Tonnage × Local Landfill Tipping Fee ($/ton) • Residual Ash Mass = Inbound Tonnage × Ash Content (typically 2% to 4%) • Ash Disposal (Off-site) = (Ash Tons × Landfill Tip Fee) + Ash Trucking Freight • Ash Disposal (On-site) = Inbound Tonnage × Spreading Rate ($0.50–$1.50/ton) 2. SAMPLE RUN: 15,000 CUBIC YARDS (2,100 TONS) OF WOOD DEBRIS • Assumptions: - 500 truck loads (30 cy / 4.2 tons per load) - 2-hour round trip travel time @ $135/hour - Landfill Tipping Fee: $55.00/ton - Pre-sorting mixed debris: $2.50/ton - Direct ACI burning cost: $10.50/ton • OPTION 1: TRUCKING & LANDFILL DISPOSAL - Pre-Sorting Cost: $5,250 ($2.50/ton) - Highway Trucking (500 loads): $135,000 ($64.29/ton) - Landfill Tipping Fees: $115,500 ($55.00/ton) ------------------------------------------------------------- TOTAL DIRECT LANDFILL COST: $255,750 ($121.79/ton | $17.05/cy) • OPTION 2: ON-SITE ACI BURNING (WITH APPROVED ASH DISPOSAL) - Pre-Sorting Cost: $5,250 ($2.50/ton) - ACI Burning Operation: $22,050 ($10.50/ton) - Ash Handling: * Path A (On-Site Soil Rake): $2,100 ($1.00/inbound ton) * Path B (Off-Site Ash Tip): $4,545 (63 tons ash hauled & tipped) ------------------------------------------------------------- TOTAL ACI COST (Path A): $29,400 ($14.00/ton | $1.96/cy) TOTAL ACI COST (Path B): $31,845 ($15.16/ton | $2.12/cy) 3. LOCAL REGULATORY CHECKLIST FOR ASH: • Agricultural / Soil Beneficial Use: Most jurisdictions permit spreading ash on-site as a soil liming agent if material was strictly unpainted, untreated wood. • Heavy Contamination / Soil Mix: If root balls contain unknown fill or industrial debris, ash may require Toxicity Characteristic Leaching Procedure (TCLP) testing prior to beneficial reuse. • Landfill Cover: Many municipal landfills accept certified clean wood ash at discounted tipping rates to use as daily landfill cover material.
77

How does it compare with tub grinding?

Tub grinders can process substantial clean woody material into grindings but require wear parts, fuel, material handling, and a destination for the product. An ACI destroys eligible material rather than producing grindings. Large contaminated root balls can be difficult for either process and may require sorting. TUB GRINDER VS. AIR CURTAIN INCINERATOR (ACI): LOGISTICS & CONTAMINATION GUIDE 1. EQUIPMENT & OPERATING TRADEOFFS: • Tub Grinder: - Produces: Wood chips, mulch, compost amendment, or hog fuel. - Resource Demand: 600–1,050 HP engine, burning 25–40 gallons of diesel/hour. - Consumables: High cost ($3.00–$7.00/ton) in teeth, hammer tips, and screens. - Handling Liability: 100% of the mass remains on the ground. A planned destination (off-site haul or broad site spreading) is mandatory. • Air Curtain Incinerator (ACI): - Produces: 95%–98% volume reduction down to mineral ash and biochar. - Resource Demand: 50–75 HP blower engine, burning 2.5–4.5 gallons of diesel/hour. - Consumables: Negligible wear parts (no spinning cutter assemblies). - Handling Liability: Zero off-site trucking for the woody mass; small volume of ash can typically be blended into topsoil on-site. 2. THE ROOT BALL & CONTAMINATION FACTOR: • In a Tub Grinder: - Rocks and dirt cause severe abrasive wear and catastrophic hammer breakage. - High risk of thrown projectiles from the tub. - Clay clogs sizing screens, causing thermal friction and stoppage. • In an ACI: - Zero mechanical damage (dirt/rock simply drops to the bottom of the firebox). - BUT soil acts as an insulator, cooling the fire bed, causing smoke, and filling the box with non-combustible mass that requires frequent dig-outs. 3. REQUIRED FRONT-END SORTING PROTOCOL: • Use an excavator with a hydraulic thumb, grapple, or stump splitter. • Shake, drop, and split root balls to drop out 80%+ of packed dirt and rock. • Co-fire de-soiled stumps in the ACI with dry, seasoned tops to sustain internal temperatures above 1,600°F. • Divert excessively rocky or clay-bound root wads directly to earth fill.
78

How does it compare with horizontal grinding?

Horizontal grinders provide controlled wood sizing for mulch, biomass, or hauling; ACIs prioritize reducing the quantity of waste to manage. Compare hourly production under similar materials, grinder maintenance, screen configuration, end-product value, and the burner’s permitting and operating costs.
79

Is burning or grinding faster?

YES. Typically 4 BurnDebris.com Air Curtain Incinerators (you can rent) costing $360,000 can out perform a $ million dollar grinder, and there is no generally no hauling when you burn. Either can be faster depending on machine sizes, wood type, feeding equipment, and what “finished” means. Grinding may process wood quickly yet leave a large product stockpile to move; burning takes time to consume material but leaves much less residue. Measure the whole disposal workflow, not just feed rate.
80

What happens to the economics when the disposal facility is far from the project?

Longer haul distances increase trucking hours, fuel, driver time, and the number of trucks required to maintain pace. This can make an onsite ACI more competitive, provided permits and site logistics allow it. The breakeven distance depends on local trucking and disposal prices.
81

How much trucking can I eliminate?

An Air Curtain Burner can eliminate 95% to 100% of the trucking. Estimate how many loads the original debris requires, then subtract the loads needed for ash and any rejected materials. Where eligible woody debris can be burned onsite, the reduction in outgoing loads can be substantial. Exact savings vary with truck capacity and debris compaction.
82

How many trucks can one Air Curtain Incinerator replace?

You can replace virtually all of wood debris hauling trucks. About 4 to 5 trucks per hour per air curtain burner can be replaced. There is no fixed equivalence because haul cycle duration is critical. For example, if burning eliminates 100 cubic yards/hour and each truck carries 20 cubic yards, that is five nominal outgoing loads/hour avoided—not necessarily five trucks. Convert avoided loads into trucks by accounting for each truck's turnaround time.
83

How much can I save in trucking costs?

Multiply avoided truck trips by the full cost per trip, including loading, drivers, fuel, equipment, mileage, and wait time. Then subtract trucking still needed for ash or unacceptable material. A project-specific haul-rate comparison is the most accurate method.
84

How much can I save in landfill or tipping fees?

Multiply the tonnage that would otherwise enter the landfill by its tipping fee and subtract ash/residue disposal charges. Verify whether fees apply by ton, cubic yard, or container. This is often one of the largest economic drivers for expensive disposal markets.
85

What is the cost of diesel per operating hour?

Multiply measured gallons burned per hour by your delivered diesel price. For example, three gallons/hour at $6.50/gallon is $19.50 per operating hour. Fuel consumption differs by engine, blower load, model, and maintenance condition.
86

What is the total operating cost per engine hour?

Include diesel, operator and excavator labor, the excavator's ownership/rental and fuel cost, maintenance, ash handling, and an allocation of rental or ownership and transportation costs. Engine-hour cost is useful for comparing options, but cost per cubic yard better reflects project productivity.
87

What labor is required?

A trained ACI operator must monitor combustion and safety; an excavator or loader operator generally feeds the unit. On large sites additional people may sort, stage, manage ash, coordinate trucks, and provide fire watch. Staffing must meet the manufacturer's instructions and any local fire or permit conditions.
88

What equipment is required in addition to the burner?

Typical support includes an appropriately sized excavator or loader, suitable debris-staging space, diesel supply, fire-suppression equipment, and equipment for ash removal. Depending on site and permits, additional water, barriers, lighting, and fire-watch measures may be necessary.
89

What is my estimated total project cost?

A useful estimate includes machine rental or ownership allocation; outbound/inbound mobilization; unloading; diesel; operator and support-equipment costs; permits; insurance; ash management; and expected downtime or weather delays. Burn Debris can compare this total with trucking, grinding, or landfill alternatives.
90

What is my estimated savings for the entire project?

Savings = the total cost of the best feasible alternative minus the all-in cost of the ACI option. Include any revenue or value from recovered chips/wood in the alternative scenario. Estimated savings should be presented with assumptions and a reasonable range, not as a guaranteed result.
91

At what project size does an Air Curtain Incinerator become economical?

There is no single minimum volume: mobilization makes small projects less attractive, while long hauling distances and high tipping fees can justify smaller volumes. The relevant question is when avoided disposal expenses exceed fixed and variable burner costs. We can calculate a breakeven cubic-yard quantity for your location.
92

When does purchasing become less expensive than renting?

Purchasing may become attractive when a company has predictable, repeated work and enough annual operating days to justify capital, maintenance, storage, insurance, transport, and resale risk. Renting typically offers greater flexibility for intermittent projects and transfers some ownership responsibilities. Compare multiyear total costs, not monthly rates alone.
93

What is the potential return on investment from purchasing a machine?

ROI depends on the revenue or disposal savings actually produced, less fuel, labor, maintenance, insurance, transport, downtime, and equipment depreciation. A simple annual ROI estimate is annual net benefit divided by invested capital, but payback period and cash flow are also important. Burn Debris can help build a project-specific model using your expected utilization.
5
Section 5 · Questions 94–155

Air Burner 300 Series: S327 and S330 Air Curtain Incinerator

62 questions
94

What engine and drive coupling configuration is installed on the S327 and S330 FireBox?

A HATZ 4H50-TIC Tier 4 Final diesel engine equipped with a fluid coupling (automatic clutch) and direct coupling mechanical drive. At times you will find them with Kubota engines. We have used John Deere, Perkins, and Cummins also. New from the factory now they are using Hatz.

95

What is the overall length, width, and height of the S330 FireBox?

The overall size of the S330 is 40 ft 4 in length x 11 ft 10 in width x 9 ft 6 in height.

96

What are the internal firebox (burn chamber) dimensions of the S330 FireBox?

The internal firebox dimensions of the S330 are 30 ft 2 in length x 8 ft 5 in width x 8 ft 1 in height.

97

What is the total approximate operating weight of the S330 FireBox?

Approximately 59,000 lb. (26,760 kg).

98

What is the average throughput capacity of the S330 FireBox?

Approximately 11 to 13 tons per hour.

99

What are the overall dimensions (L x W x H) of the S327 FireBox?

The overall size of the S327 is 37 ft 4 in length x 11 ft 10 in width x 9 ft 6 in height.

100

What are the internal firebox (burn chamber) dimensions of the S327 FireBox?

The internal firebox dimensions of the S327 are 27 ft 2 in length x 8 ft 5 in width x 8 ft 1 in height.

101

What is the total approximate weight of the S327 FireBox?

Approximately 54,600 lb. (24,800 kg).

102

What is the average throughput capacity of the S327 FireBox?

Approximately 9 to 11 tons per hour.

103

What is the average diesel fuel consumption rate for the S327 and S330 FireBox models?

Approximately 3.0 gallons per hour at average operating RPM.

104

What is the minimum diesel fuel tank capacity on the S327 and S330 FireBox?

Minimum 110 gallons (416 Liters).

105

What electric motor option and variable frequency drive configuration are available for the S327 and S330 FireBox?

A heavy-duty 3-phase electric motor equipped with an enclosed pre-programmed variable frequency speed controller (VFD), accepting Three Phase 480V (50Hz or 60Hz), or optional 400V/415V.

106

What type of base frame structure is used on the S327 and S330 FireBox?

A heavy skid-type base frame open to the earthen soil designed for dragging across the ground on site.

107

How much do each of the rear access and clean-out doors weigh on the S327 and S330 FireBox?

Each refractory-lined rear door weighs approximately 2,000 lb.

108

What terrain slope limitation must be strictly observed before opening the 2,000 lb rear doors on the S327 and S330 FireBox?

The rear doors should not be opened if the FireBox is inclined on any axis more than 5 degrees.

109

Why must dirt be shoveled around the inside bottom rails of the S327 and S330 FireBox during site placement?

To seal openings under the skids caused by uneven ground terrain, preventing heat and smoke from escaping and stopping hot gas from reaching the forward equipment deck.

110

Why is digging an earthen pit in the center of the S327 and S330 FireBox strictly prohibited?

Digging a pit makes it difficult to seal the unit, pit walls deteriorate during burning, and escaping heat under the engine deck can create severe deck hazards and voids the factory warranty.

111

On what surface types is it strictly prohibited to operate the S327 and S330 FireBox?

Combustibles (dry grass, peat moss), concrete pads, asphalt, gravel, or crushed stone surfaces.

112

Why will operating the S327 or S330 FireBox on a concrete pad or gravel cause an explosion hazard?

Trapped moisture inside the concrete or rock vaporizes rapidly from intense downward heat, generating extreme internal pressure that causes concrete or stones to explode violently.

113

Why must the HATZ diesel engine on the S327 and S330 FireBox be warmed up and then shut down prior to lighting the fire?

Because the fluid coupling spins the fan even at idle, which creates air movement that makes lighting difficult and can blow out a newly lit fire.

114

What is the base engine idle speed on the S327 and S330 FireBox?

900 RPM.

115

What is the warm-up and cool-down throttle setpoint on the S327 and S330 FireBox?

1400 RPM.

116

What is the Operating Low engine RPM setting specifically for the S327 FireBox?

2200 RPM.

117

What is the Operating Low engine RPM setting specifically for the S330 FireBox?

2300 RPM.

118

What is the Operating High (maximum operating) engine RPM setting specifically for the S327 FireBox?

2500 RPM.

119

What is the Operating High (maximum operating) engine RPM setting specifically for the S330 FireBox?

2600 RPM.

120

How does the fluid coupling behave when the ignition switch is turned to OFF on the S327 and S330 FireBox?

The air fan free-wheels through the fluid coupling and gradually spins to a stop without harming the engine.

121

What function does turning the ignition key to the 'Auto' position have on the S327 and S330 FireBox?

The 'Auto' key position is non-functional and not used for the HATZ diesel engine.

122

What must be done before performing any welding repairs on the S327 and S330 FireBox?

Disconnect the negative battery cable and physically remove the Electronic Control Module (ECM) from the engine brackets to prevent destroying the computer controller.

123

Why is loading over the air manifold recommended for the S327 and S330 FireBox?

Loading over the manifold is the safest side for personnel from escaping embers and reduces the risk of excavator implements accidentally striking and damaging the manifold.

124

How is a cold start fire ignited inside the S327 and S330 FireBox?

From the bottom through the dedicated side access doors in the panels on the manifold side of the machine, using a propane torch or oil-soaked rags on poles.

125

How much diesel fuel is sprayed over the initial wood bed when cold lighting the S327 or S330 FireBox?

Approximately 10 gallons spread across the initial half-full load of dry wood, concentrating near the side lighting holes and back wall.

126

How does the operator 'fan' the young fire during startup in the S327 FireBox?

By increasing engine speed from 1400 RPM up to 2500 RPM for 3 to 8 minutes, then throttling back to 1400 RPM to spread the flames without blowing the fire out.

127

How does the operator 'fan' the young fire during startup in the S330 FireBox?

By increasing engine speed from 1400 RPM up to 2600 RPM for 3 to 8 minutes, then throttling back to 1400 RPM to spread the flames without blowing the fire out.

128

What load height restriction applies when burning wooden pallets in the S327 and S330 FireBox?

Do NOT load higher than approximately 3/4 of the firebox height, as spent pallets burn intensely hot and will warp or destroy the air manifold.

129

When burning clean logs and wood debris, what is the maximum load level inside the S327 and S330 FireBox?

Just below the bottom of the air manifold nozzles; loading higher breaks the air curtain and causes smoke emissions.

130

When is the best time to load heavy tree stumps into the S327 and S330 FireBox?

After the first hour of burning once the base fire has achieved full operating temperature.

131

How far in advance of site shutdown must wood waste loading cease on the S327 and S330 FireBox?

Loading should stop 1 to 2 hours before planned shutdown.

132

What flame clearance distance to the manifold is required before shutting down the engine on the S327 and S330 FireBox?

DO NOT shut off the engine or airflow while there are still flames within 24 inches of the manifold, as radiant heat will warp the manifold assembly.

133

To what residual bed depth must the fire burn down before the engine can be turned off on the S327 and S330 FireBox?

When the fire has burned down to about 1 or 2 feet and no flames are visible near the manifold.

134

Why must water never be sprayed onto the interior walls of the S327 and S330 FireBox during shutdown?

Cold water sprayed onto hot refractory ceramic panels causes thermal shock cracking and severe panel deterioration.

135

What is the maximum permissible ash depth inside the S327 and S330 FireBox before cleanout is mandatory?

No more than 3 feet of ash (which represents approximately 20 hours of burning operations).

136

Why does operating efficiency drop when ash depth exceeds 3 feet in the S327 and S330 FireBox?

Excess ash reduces combustion chamber volume, impairs internal circular airflow, and risks unburned embers being blown out of the box.

137

How is daily ash cleanout performed on the S327 and S330 FireBox when preserving an ember bed for a hot restart?

By opening the rear doors and scooping out 1 or 2 scoops of ash with an excavator or specialized Air Burners ash rake, leaving a bed of glowing coals. When you cover with dirt at the end of the day the coals will remain hot until the next day or longer.

138

What dragging procedure is used to empty the entire ash bed from the S327 and S330 FireBox at the end of a job?

Open the rear doors, cover the ash bed with a thin layer of dirt to control dust, attach certified cables to the front pull block or pad eyes, and drag the skid forward. Be sure to secure the doors wide open or you will break them.

139

What safety rule applies to walking inside the S327 or S330 FireBox during dragging operations?

NEVER walk or stand inside the FireBox while it is being towed or dragged; dirt buildup under skids can lift and dislodge 2,000 lb ir heavier panels onto personnel.

140

How many lifting pad eyes are equipped on the S327 and S330 FireBox for crane handling?

Four (4) designated lifting pad eyes (two on each side) marked with yellow 'Lifting Point' decals with up-arrows.

141

What safety rules must be followed when utilizing the observation ladder on the S327 and S330 FireBox?

Only authorized personnel wearing PPE may use the ladder, they must maintain a firm grip on the handle, and they must never step beyond the top ladder rung.

142

What model and size flexible drive coupling is installed between the engine and air fan on the S327 and S330 FireBox?

Dodge Raptor Coupling Size E30 (Air Burners Part Number 5000-2120).

143

What is the required hub gap measurement 'A' for the Dodge Raptor E30 coupling on the S327 and S330 FireBox?

2.55 inches (65 mm).

144

What is the maximum allowable angular misalignment value 'C' for the Dodge Raptor E30 coupling on the S327 and S330 FireBox?

0.284 inches (7.2 mm).

145

What is the maximum allowable parallel misalignment value 'D' for the Dodge Raptor E30 coupling on the S327 and S330 FireBox?

0.188 inches (4.8 mm).

146

What tightening torque is specified for the 3/8-inch element flange bolts on the Dodge Raptor E30 coupling of the S327 and S330 FireBox?

42 ft-lbs (502 in-lbs / 57 N�m).

147

Can the Dodge Raptor element bolts be reused after disassembly on the S327 and S330 FireBox?

No, bolts should be used only one time because they feature factory pre-applied thread-locking patches.

148

How is shaft alignment corrected if the Dodge Raptor E30 coupling on the S327 and S330 FireBox exceeds tolerance?

By adjusting the four (4) elastomeric engine isolators (motor mounts) beneath the engine base.

149

What is the lubrication interval and grease amount for the air fan bearings on the S327 and S330 FireBox?

Relubricate both inside and outside fan bearings every 2,100 hours of runtime with 12.5 g (0.44 oz.) of SKF LGMT 3IN/18 grease.

150

What is the lubrication interval and grease amount for the fluid coupling bearing on the S327 and S330 FireBox?

Relubricate every 120 hours of runtime with 10 g (0.35 oz.) of SKF LGMT 3IN/18 grease.

151

What service interval is required for factory servicing of the fluid coupling on the S327 and S330 FireBox?

Every 2 years or as needed through Air Burners Technical Support.

152

What engine oil viscosity and crankcase capacity are required for the HATZ 4H50 engine in the S327 and S330 FireBox?

10W40 or 15W40 Diesel Grade (Ultra-Low Sulfur); oil capacity is 7.4 quarts (7.0 Liters).

153

What is the routine maintenance interval for engine oil, oil filter, and air filter elements on the S327 and S330 FireBox?

Initial service after the first 50 operating hours, then every 500 operating hours thereafter.

154

What patching compound is specified for repairing surface cracks in the refractory panels of the S327 and S330 FireBox?

Air Burners Part # 6900-1003 'Thermal-Ceramic Wet Pre-Mix' air-cured compound.

155

How long must the thermal-ceramic patching compound cure before the S327 or S330 FireBox can be returned to service?

Allow the patching material to harden overnight before firing the machine.

6
Section 6 · Questions 156–202

McPherson M30G Air Curtain Incinerator

47 questions
156

Who is the manufacturer of the M30G Air Curtain Destructor?

McPherson Systems, Inc., located in Tifton, Georgia (phone: 229-386-2367).

157

What should be done with the operator's manual if the machine is sold?

The manual is considered a permanent part of the machine and should remain with the machine if sold.

158

What warning is given regarding operating the machine before reading the manual?

Caution: Read the Owner's Manual before operating the machine; do not start the machine unless you understand the instructions, as failure to do so could result in personal injury and/or equipment and property damage.

159

How does the McPherson Systems Air Curtain Destructor function?

It creates and maintains a uniform curtain of air across the top of the pit in which burning occurs, prohibiting smoke from escaping and increasing oxygen to the fire for faster and more complete combustion.

160

What are the typical operating temperatures inside the pit during burning?

Operating temperatures in the pit run between 1800°F and 2200°F.

161

Why are tractor or forklift tire stops not required for the refractory lined pit burner?

Because the pit is constructed above ground level.

162

What types of waste materials are designed to be burned in the destructor?

All non-treated wastes.

163

What weather conditions are considered unsuitable for operating the machine?

Rain, low clouds, or strong wind gusts are not suitable conditions for burning; the machine can only be operated properly when the weather is clear.

164

What action should be taken if sudden wind gusts occur during operation?

Stop loading the pit and allow the machine to continue operating until the existing fire has burned down.

165

What is the recommended trench length according to the M30G set-up diagram?

30 feet.

166

What is the recommended pit depth for the M30G setup?

10 feet or greater depth.

167

What is the standard width of the dirt trench for the M30G, and how can local law affect it?

The standard width is 9 feet, but it may be 8 feet in some areas depending on local laws.

168

From which location should material to be burned be loaded into the trench?

Material to be burned is loaded into the dirt trench from the side opposite the air manifold.

169

How full should a cold pit be loaded before ignition?

Load the pit 1/2 full with waste.

170

How much accelerant is used for initial lighting in a cold pit, and where should it be placed?

Douse the waste with 1 pint of fuel oil or diesel fuel, putting the majority of the oil on the waste at the front center side of the trench.

171

What types of ignition accelerants are strictly prohibited?

Highly volatile solvents such as mineral spirits, gasoline, etc., must not be used for ignition.

172

What regulatory check is advised before using accelerants?

Call your local EPA office for clarification, as some states do not allow the use of accelerants.

173

When should air from the fan first be introduced during a cold start?

Allow sufficient time for the fire to take hold before introducing any air from the air supply.

174

At what engine speed and duration should the unit run once the fan clutch is engaged after initial fire take-hold?

Increase engine speed to approximately 1100 RPM until ignition is uniform across the pit (usually 10 to 15 minutes).

175

What is the maximum height to which material can be loaded relative to the air curtain?

Ensure that no material protrudes above the air curtain when loading the pit.

176

What is the target engine operating speed during continuous burning?

Engine speed can be increased up to 2000 RPM.

177

What cold start steps can be omitted if hot coals remain from the previous day's burn?

Steps 2 and 3 (adding fuel oil/diesel and initial torch lighting) can be omitted.

178

How does starting a fire with existing coals differ regarding fan air introduction?

When lighting coals left from burning the previous day, it is necessary to introduce air from the fan before burning can start.

179

What must be done with the clutch lever before starting the diesel engine?

Disengage the clutch lever.

180

What engine condition must be met before the diesel engine will start?

The engine will start after the oil pressure level has risen to the proper operating level.

181

How is the fan clutch engaged on the unit?

Push the clutch lever forward/inward to engage the clutch.

182

How is engine throttle speed adjusted on the electronic control panel?

Using the throttle adjustment buttons: the up arrow increases throttle and the down arrow decreases throttle.

183

What is the contact phone number listed on the Flint Power Systems control panel?

1-800-821-4025.

184

What is the step-by-step procedure to shut down the diesel engine?

1. Disengage the clutch lever; 2. Reduce engine speed to 800 RPM; 3. Maintain 800 RPM for several minutes to allow the engine to cool; 4. Switch the ignition key to the OFF position.

185

How far in advance of shutdown should waste loading cease?

Stop loading the pit with material approximately 2 hours before shutdown is desired.

186

Why must the main fan keep running after loading stops during shutdown?

The main fan must remain running to allow remaining material in the pit to burn down completely.

187

When should the air supply be switched off during shutdown?

Turn off the air supply when the fire inside the pit has completely burned out.

188

What is the maximum allowable ash buildup in the pit?

Ashes should not build up higher than 1/3 of the pit depth or to the point where they impede combustion and blow out of the pit, whichever occurs first.

189

How should ashes be conditioned prior to removal from the pit?

Saturate the ashes with water for cooling and dust control.

190

How should excavated ashes be handled after removal to ensure total cooling?

Spread them out approximately 6 to 12 inches deep to allow total cooling before proper disposal.

191

Which components require daily lubrication?

The two (2) main fan bearings.

192

Which components require weekly lubrication?

The one (1) idler arm bushing and designated weekly drive points.

193

When should the door hinges be greased?

Hinges should be greased before the doors are opened.

194

What is the standard warranty period for the McPherson Systems pit burner?

One year, beginning from the date of sale of the pit burner by McPherson Systems, Inc.

195

What specific items are excluded from warranty coverage?

Drive belts and routine service items.

196

What are McPherson Systems' responsibilities under a warrantable failure?

McPherson Systems will furnish all parts and labor needed to repair damage resulting from a warrantable failure.

197

What must an owner do before the warranty expires to make a claim?

Notify McPherson Systems, Inc. of any warrantable failure and have the failure repaired by an official warranty facility.

198

Who is responsible for the cost of maintenance items replaced during warranty repairs?

The owner is responsible, unless such items are not reusable due to the warrantable failure.

199

Who pays for communication and freight costs related to warranty service?

The owner is responsible for communication expenses and similar costs; all warrantable items are F.O.B. Tifton, Georgia.

200

Does the warranty cover downtime, cargo damage, or incidental/consequential losses?

No, the owner is responsible for non-product repairs, downtime expenses, cargo damage, and all business costs; McPherson Systems is not responsible for incidental or consequential damages.

201

What condition voids the factory warranty?

The warranty is void and nonbinding if the product is determined to have been modified so as to alter its operating characteristics.

202

How are third-party components not manufactured by McPherson Systems warranted?

They are subject to the warranty terms imposed by the original manufacturer of each respective component.

7
Section 7 · Questions 203–250

M40E McPherson Systems Air Curtain Incinerator FAQ

48 questions
203

What is the model name and equipment type covered by this operator's manual?

M40E Waste Burner / Refractory Lined Pit Burner.

204

Who manufactures the M40E Waste Burner?

McPherson Systems, Inc., located in Tifton, Georgia.

205

What is the phone number and email address for McPherson Systems, Inc.?

Phone: (229) 386-2367; Email: mcsales@mcphersys.com.

206

What are the office hours for McPherson Systems, Inc. customer support?

8:00 A.M. to 5:00 P.M. EST, Monday through Friday.

207

What warning is given to operators prior to starting the M40E machine?

Caution: Read Owner's Manual before operation; do not start the machine unless you understand these instructions, as failure to read this manual could result in personal injury and/or equipment and property damage.

208

What should happen to the operator's manual if the M40E is sold?

This manual is a permanent part of the machine and should remain with the machine should you decide to sell it.

209

What is the operating principle of the M40E Refractory Lined Pit Burner?

It creates and maintains a uniform curtain of air across the top of a refractory lined pit in which burning is done, prohibiting smoke from leaving the pit and increasing burning efficiency by adding oxygen.

210

What are the typical operating temperatures inside the refractory lined pit during burning?

Operating temperatures in the pit run between 1800�F and 2200�F.

211

Why are tractor or forklift tire stops not needed for M40E operation?

Because the refractory lined pit is constructed above ground level.

212

What kind of waste materials is the machine designed to burn?

All non-treated wastes.

213

Under what weather conditions can the M40E machine be operated properly?

Only when the weather is clear; rain or low clouds are not suitable conditions for burning.

214

What should an operator do if wind gusts occur during burning operations?

Stop loading the pit and allow the machine to operate until the fire has burned down.

215

How full should the pit be loaded with waste before cold ignition?

Load the pit 1/2 full with waste.

216

How much accelerant is used for cold ignition, and where should it be poured?

Douse the waste with 1 pint of fuel oil or diesel fuel, putting the majority of the oil on the waste at the front center side of the pit.

217

What types of ignition fluids are strictly prohibited?

Do NOT use highly volatile solvents such as mineral spirits, gasoline, etc. for ignition.

218

What agency should be contacted regarding local restrictions on accelerants?

Call your local EPA office for clarification, as some states do not allow the use of accelerants.

219

When should the air supply fan be introduced during a cold start?

Allow sufficient time for the fire to take hold before introducing any air from the air supply.

220

At what fan speed should the fan initially be set as the fire grows in intensity?

Turn the fan on at approximately 1100 RPM until ignition is uniform across the pit (usually 10 to 15 minutes).

221

What restriction must be observed regarding material height when loading the pit?

Ensure that no material protrudes above the air curtain when loading the pit.

222

When is the air supply fan turned on fully during the loading sequence?

Turn on the air supply fan after the fire has ignited across the pit.

223

Under what condition can the accelerant and manual lighting steps be omitted during start-up?

Steps 2 & 3 can be omitted if the pit has enough coals remaining from burning the day before.

224

Why must the fan be started differently when relighting hot coals from the previous day?

It will be necessary to introduce air from the fan before burning can start.

225

How far in advance of the desired shutdown must pit loading stop?

Approximately 2 hours before shut down is desired, stop loading the pit with material.

226

Why must the air supply fan remain running during the shutdown process?

To ensure the air curtain remains active and allows the remaining material to burn down in the pit.

227

When should the air supply be turned off during shutdown?

Turn off the air supply when the fire inside the pit has completely burned out.

228

When is it safe to unload ashes from the pit?

Allow ashes to cool before unloading them from the pit.

229

Why is regular ash removal required?

Ash removal is required in order to maintain efficient and proper combustion.

230

What is the maximum permissible level of ash buildup in the pit?

Ashes should not be allowed to build up higher than 1/3 the pit depth, or to the point where they begin to impede combustion and blow out of the pit, whichever occurs first.

231

What preparation is required before removing ashes from the pit?

Ashes should be saturated with water for cooling and dust control before removal.

232

How deep should wet ashes be spread after removal to ensure complete cooling?

Spread them out approximately 6 to 12 inches deep to allow total cooling to take place before final disposal.

233

Which components on the M40E require daily greasing?

Main Fan Bearings (2 locations per fan), Underfire Blower (2 locations), and Midfire Blower (2 locations).

234

How many lubrication points are on the main fan bearings daily?

2 locations per fan.

235

How many lubrication points are on the underfire and midfire blowers daily?

2 points on the Underfire Blower and 2 points on the Midfire Blower.

236

Which components require weekly greasing on the M40E?

Idler arm bushing (1 per fan).

237

Which components require monthly greasing on the M40E?

Bottom doors (12 locations).

238

When should the door hinges be greased?

Hinges should be greased before the doors open.

239

What is the warranty coverage period for the M40E pit burner?

One year, beginning with the date of sale of the pit burner by McPherson Systems, Inc.

240

What failures are covered under the McPherson Systems warranty?

Any failure of the Product which results, under normal use and service, from a defect in material or workmanship (Warrantable Failure).

241

What items are explicitly excluded from warranty coverage?

Belts and service items are not covered by the warranty.

242

What are McPherson Systems' responsibilities during a warrantable failure?

McPherson Systems will furnish all parts and labor needed to repair the damage to the product resulting from the Warrantable Failure.

243

What are the owner's responsibilities for maintaining the warranty?

The owner is responsible for the operation and maintenance of the burner as specified in the operator's manual.

244

What procedure must the owner follow before the warranty expires to claim repairs?

The owner must notify McPherson Systems, Inc. of any Warrantable Failure and have the failure repaired by an official warranty facility.

245

What hours and phone number are available to locate official warranty service centers?

Call 1-229-386-2367 from 9:00 A.M. to 5:00 P.M. EST, Monday through Friday.

246

Who pays for maintenance items replaced during warranty repairs?

The owner is responsible for the cost of maintenance items replaced during warranty repairs, unless such items are not reusable due to Warrantable Failure.

247

Who is responsible for communication and freight expenses during a warranty claim?

The owner is responsible for communication expenses and similar costs; all warrantable items are F.O.B. Tifton, Georgia.

248

Is McPherson Systems, Inc. liable for downtime expenses, cargo damage, or incidental damages?

No; the owner is responsible for non-product repairs, downtime expenses, cargo damage, and all business costs and losses. McPherson Systems is not responsible for incidental or consequential damages.

249

What action voids the warranty on the M40E?

The warranty is void and nonbinding if, at the time of failure, the product is determined to have been modified so as to alter its operating characteristics.

250

How are components not manufactured by McPherson Systems warranted?

Components not manufactured by McPherson Systems, Inc. are subject to the warranty imposed by the manufacturer of that component.

8
Section 8 · Questions 251–320

Hatz 4H50TIC Engine FAQ

70 questions
251

What type of engine is the Hatz 4H50TIC?

It is a liquid-cooled four-stroke diesel engine with direct injection. (Page 21, Paragraph 1 / Table 'Type')

252

How many cylinders does the Hatz 4H50TIC have?

The 4H50TIC has 4 cylinders. (Page 21, Paragraph 1 / Table 'Number of cylinders')

253

What are the bore and stroke dimensions of the 4H50TIC?

The bore is 84 mm and the stroke is 88 mm. (Page 21, Paragraph 1 / Table 'Bore/Stroke')

254

What is the total displacement of the 4H50TIC engine?

The displacement is 1.951 liters. (Page 21, Paragraph 1 / Table 'Displacement')

255

What is the normal operating engine oil pressure range for the 4H50TIC?

The oil pressure is 2.5 bar to 4.5 bar. (Page 21, Paragraph 1 / Table 'Engine oil pressure')

256

What is the direction/sense of rotation of the engine?

Left (counterclockwise), viewing toward the flywheel. (Page 21, Paragraph 1 / Table 'Sense of rotation')

257

How is the tappet / valve clearance adjusted on the 4H50TIC?

It features automatic hydraulic valve adjustment and is completely maintenance-free. (Page 21, Paragraph 1 / Table 'Tappet clearance')

258

What is the maximum permissible continuous tilt position of the 4H50TIC?

For HATZ cooler with integrated expansion tank: cooler low is 20°, other parts 30°. For HATZ cooler with external expansion tank: 30° continuous (or up to 40° for a maximum of 7 hours, after which the engine must be returned to horizontal and switched off for at least 5 minutes). (Page 21, Paragraph 1 & Footnotes 1-2)

259

What are the battery capacity requirements for the 4H50TIC?

12 V - 110 Ah / 760 A (EN) / 800 A (SAE), or 24 V - 66 Ah / 510 A (EN) / 540 A (SAE). (Page 21, Paragraph 1 / Table 'Battery capacity')

260

What does the abbreviation TIC designate in the model 4H50TIC?

TIC designates an engine equipped with a turbocharger, charge air cooling (intercooler), cooled exhaust gas recirculation (EGR), and diesel oxidation catalyst (DOC). (Page 22, Paragraph 1 / Table 'Engine specifications')

261

Does the 4H50TIC have a Diesel Particulate Filter (DPF)?

No, the 4H50TIC has a DOC and EGR, but does not include a DPF (the model with DPF is the TICD). (Page 22, Paragraph 1 / Table 'Engine specifications')

262

What is the engine oil capacity of the 4H50TIC during an oil change with filter?

Depending on the sump depth/contour: for h=118 mm it is 7.0 liters; for h=149 mm it is 7.3 liters; for h=148 mm it is 9.0 liters. (Page 22, Paragraph 2 / Table 'Engine oil capacities')

263

What is the difference in oil quantity between the MIN and MAX dipstick markings on the 4H50TIC?

The difference between MIN and MAX is 1.0 liter. (Page 22, Paragraph 2 / Table 'Engine oil capacities')

264

What is the coolant filling capacity for the 4H50TIC?

Approximately 13.7 liters with an external expansion tank, or 14.7 liters with an integrated expansion tank. (Page 23, Paragraph 1 / Table 'Coolant filling quantities')

265

What is the bare weight and equipped weight of the 4H50TIC engine?

Without operating fluids: 173 kg for standard engine (without cooler), 255 kg for OPU (Open Power Unit), and 354 kg for the Silent Pack version. (Page 23, Paragraph 2 / Table 'Weights')

266

What is the engine oil consumption limit for the 4H50TIC after the running-in period?

Max. 0.5% of fuel consumption, pertaining to full load. (Page 21, Paragraph 1 / Table 'Engine oil consumption')

267

What is the internal Hatz engine type number for the 4H50TIC?

The engine type number is 136. (Page 26, Paragraph 2 / Table 'Engine type number')

268

What is the tightening torque for the oil drain screw?

58 Nm. (Page 24, Paragraph 1 / Table 'Screw tightening torque')

269

What is the tightening torque for the engine cooler and charge air cooler drain screws?

50 Nm each. (Page 24, Paragraph 1 / Table 'Screw tightening torque')

270

What is the tightening torque for the protective guard screws (M10) on the TIC specification?

30 Nm. (Page 24, Paragraph 1 / Table 'Screw tightening torque')

271

What is the tightening torque for the screws on the breather cap of the crankcase ventilation?

4 Nm. (Page 24, Paragraph 1 / Table 'Screw tightening torque'; and Page 116, Step 6)

272

What oil quality specification is required for the 4H50TIC?

Because the 4H50TIC is equipped with a DOC, it requires 'low SAPS' oil meeting ACEA E6 or E8 (recommended), ACEA E9 or E11, ACEA C3/C4 (HTHS >= 3.5 mPas), or API CK-4 / CJ-4. (Page 27, Paragraph 1-2)

273

Why must 'low SAPS' engine oil be used in the 4H50TIC?

Unsuitable engine oil with higher sulfate ash, phosphor, and sulfur diminishes the functionality and service life of the catalytic converter (DOC). (Page 27, Paragraph 2, CAUTION box)

274

What engine oil viscosities are approved across operating temperature ranges?

0W/30 (-40°C to +30°C), 0W/40 (-40°C to +45°C), 5W/30 (-30°C to +30°C), 5W/40 (-30°C to +45°C), 10W/40 (-20°C to +45°C), and 15W/40 (-15°C to +40°C). (Page 27, Diagram 'Oil viscosity')

275

What is the recommended factory coolant for Hatz engines?

Mitan C12+ (5 liters container, Hatz order no. 0000 055 413 00). (Page 29, Paragraph 1 / Table 'Recommended cooler coolant')

276

What are the permissible mixing ratios of coolant fluid to water?

Min. 40 vol% coolant / 60 vol% water (frost-resistant to -24°C) to max. 50 vol% coolant / 50 vol% water (frost-resistant to -36°C). Exceeding 50 vol% degrades cooling action and frost protection. (Page 31, Paragraph 3 & Page 32, Table)

277

What water quality limits apply when mixing coolant concentrate?

Max. water hardness 20 °dGH (3.6 mmol/l), max. chloride content 100 ppm, max. sulfate content 100 ppm. Demineralized or distilled water is ideal. (Page 31, Paragraph 3 & Page 32, Table)

278

What types of diesel fuel are permitted for the 4H50TIC?

Europe: EN 590 or EN 15940 (paraffinic diesels: XTL, BTL, GTL, HVO, e-Fuels, CTL); UK: BS 2869 A1/A2; USA: ASTM D 975-09a 1-D S15 or 2-D S15 (Ultra Low Sulfur Diesel only); Japan: JIS K 2204 (max HFRR 520 um). (Page 32, Paragraph 2-3)

279

Can standard high-sulfur diesel be used in the 4H50TIC?

No. Engines equipped with DOC require Ultra Low Sulfur Diesel (e.g. S15) to prevent catalytic converter failure. (Page 25, Item 5 & Page 32, Paragraph 2)

280

What fuel should be used below 0°C?

Cold-resistant winter diesel fuel should be used for outside temperatures below 0°C to prevent fuel gelling/waxing. (Page 33, Paragraph 2)

281

Where is the engine type plate located on the 4H50TIC?

The engine type plate is affixed to the crankcase on the intake/starter side. (Page 25, Paragraph 1 & Page 36, Item 12)

282

How is the engine serial number broken down?

Position 1: Engine type number (e.g. 136); Position 2: Engine serial number; Position 3: Model year; Position 4: Consecutive fabrication number. (Page 26, Paragraph 1)

283

Where are the engine lifting eyes located and what rule applies when lifting?

They are attached at the top of the cylinder block/head (2 or 3 lifting eyes). All lifting eyes must always be used simultaneously with a hoist of sufficient capacity at a minimum chain/sling length of 780 mm. (Page 38, Item 1 & Pages 55, 57-58)

284

What electronic sensors and actuators are installed on the 4H50TIC?

Crankshaft speed sensor, air filter differential pressure sensor, rail pressure sensor, rail pressure control valve, EGR valve, coolant level sensor, coolant temperature sensor, charge air pressure and temperature sensor, camshaft sensor, low fuel pressure and fuel temperature sensor, water-in-fuel sensor, oil pressure and temperature sensor, metering unit on high-pressure pump, and ambient pressure sensor (in ECU). (Pages 43-45, Items 1-19)

285

What fuse ratings are used on the 4H50 central electrics board?

F1: Signal inputs for control unit (5 A); F2: Fuel pump (10 A); F3: Glow plugs (40 A); F4: Voltage supply for control unit (15 A); F5: Ignition terminal 15 (10 A); F6: Starter terminal 50 (30 A); F7: Ignition terminal 15 additional consumers (4 A); F8: Voltage converter on 24 V system (15 A). (Page 46, Table 'Central electrical system')

286

What minimum engine load is required during continuous operation?

Engine load must be maintained at at least 15% to avoid impairing running characteristics; prolonged zero/very low load must be followed by a brief period of higher load before shutoff. (Page 66, CAUTION box)

287

Is the use of starting fluid (e.g. ether) permitted on the 4H50TIC?

No. Starting fluid must never be used because uncontrolled ignition can cause severe engine damage. (Page 67, CAUTION box)

288

What is the maximum duration for a single starting attempt with the starter?

A starting attempt must last a maximum of 30 seconds. If the engine does not start, turn the key back to '0' and eliminate the cause. (Page 68, NOTICE box)

289

When does the pre-glow indicator light up on the Hatz Smart Panel?

It lights up at engine temperatures below 30°C. You should only start the engine after the indicator goes out. (Page 49, Table row 4)

290

What should the operator do before switching off the engine after operating at high load?

Allow the engine to idle / cool down for approximately 5 minutes at reduced speed and load to prevent damage from heat accumulation. (Page 70, CAUTION box)

291

What procedure must be followed when using a battery main disconnect switch?

Wait at least 30 seconds after switching the engine off before turning off the battery main switch, allowing the ECU time to save data and finish internal processes. (Page 71, NOTICE box)

292

What occurs when the engine goes into 'Emergency Operation' mode?

The available torque is reduced and the maximum speed is limited to 1900 rpm. The engine must only be run briefly to move the machine out of danger. (Page 50, Paragraph 2)

293

How is the fuel system vented/bled on the 4H50TIC?

Turn starting key to 'I' without starting; the electric fuel pump runs for approx. 30 seconds. Turn key to '0' and repeat this cycle several times until air is purged, then start the engine. (Page 63-64, Section 6.6)

294

Why must continuous-running engines be shut off for at least 30 seconds during refueling?

The ECU tests continuity of the water-in-fuel sensor wiring only on startup. Power cycling ensures the wiring and sensor are properly diagnosed. (Page 75, NOTICE box)

295

What checks must be carried out daily or every 8 to 15 operating hours?

Check engine oil level, check combustion air intake area, check cooler fins for contamination, and check the cooling system for proper level and leaks. (Page 83, Table 'Daily checks')

296

What maintenance tasks are required after the initial 50 operating hours of a new or rebuilt 4H50TIC?

Change engine oil and oil filter, and check all accessible screw connections for tightness. (Page 83, Table 'Initial service')

297

What is the routine maintenance interval for oil and fuel filter replacement?

Every 500 operating hours or at least every 12 months, whichever comes first. (Page 84, Table 'Routine service' & Footnote 2)

298

How often should the oil separator cartridge of the crankcase ventilation be replaced?

Every 500 operating hours or every 12 months. (Page 84, Table 'Routine service' & Page 115, Section 8.2.12)

299

How often should the poly v belt be checked and replaced on models with a three-phase alternator?

Checked every 500 operating hours / 12 months; replaced as necessary, but at the latest every 3,000 operating hours. (Page 84-85, Tables & Pages 104-108)

300

How often should the poly v belt be replaced on models without a three-phase alternator?

Every 4,000 operating hours. (Page 85, Table 'Routine service' & Page 114, Section 8.2.11)

301

What is the coolant replacement interval for the 4H50TIC?

Every 4 years. (Page 85, Table 'Routine service' & Page 125, Section 8.2.18)

302

How often must the EGR main radiator be cleaned on the 4H50TIC?

Every 4,000 operating hours (to be performed by trained technicians). (Page 85, Table 'Routine service' & Footnote 6)

303

How often must the charge air cooler (intercooler) be drained on the 4H50TIC?

Every 500 operating hours or every 12 months. (Page 84, Table 'Routine service' & Page 128, Section 8.2.19)

304

What are the factory vibration frequency setting values for the poly v belt tension?

New belt: 210 Hz (+10 Hz); belt after maintenance interval: 150 Hz (+10 Hz); minimum permissible tension: 125 Hz. (Page 107, Table 'Setting values for the belt tension')

305

What is the factory default password to reset the service interval indicator on the Hatz Smart Panel?

The default factory password is 2354. (Page 130, Step 4)

306

How should the primary air filter cartridge be serviced and how often must it be replaced?

Checked every 500 hours or when indicated; can be blown out with dry compressed air (max 5 bar) from inside out only once; must be replaced at least every 12 months. (Pages 84, 123-125, Section 8.2.17)

307

When must the secondary (safety) air filter cartridge be replaced?

It cannot be cleaned. It must be replaced after every 5th replacement of the primary filter, but no later than every 2 years. (Page 85, Footnote 4 & Page 124, Step 4)

308

What is the tightening torque for the plastic screw cap on the main fuel filter housing?

25 Nm. (Page 121, Diagram & Page 122, Step 10)

309

Why must main fuel filters always be installed dry without prefilling?

Fuel filters must be installed dry and not prefilled to prevent unfiltered contaminants and dirt particles from entering and damaging the high-pressure common rail injection system. (Page 120, CAUTION box)

310

How is water drained from the main fuel filter / water separator?

Place container under the drain socket, open drain screw (and vent screw if flow is slow) until clear diesel fuel emerges after water, then tighten screws. (Pages 116-117, Section 8.2.14)

311

Are cylinder head screws and injection system screws permitted to be retightened during maintenance?

No. Adjusting screws on the injection system are sealed with locking varnish and must not be touched, and cylinder head screws must not be retightened. (Page 116, Section 8.2.13, Safety note)

312

What do the diagnostic trouble code abbreviations SPN, FMI, and OC mean?

SPN = Suspect Parameter Number (error signal parameter); FMI = Failure Mode Identifier (error type); OC = Occurrence Count (error frequency). (Page 135, Paragraph 5)

313

What are the cable cross-section requirements when jump-starting (start support)?

For 12-volt systems: minimum 50 mm²; for 24-volt systems: minimum 35 mm². (Page 137, Paragraph 2, WARNING box)

314

What is the correct cable connection and disconnection sequence for jump starting?

Connection sequence: 1 (positive to discharged) -> 2 (positive to booster) -> 3 (negative to booster) -> 4 (negative to discharged). Disconnection sequence is the exact reverse: 4 -> 3 -> 2 -> 1. (Pages 138, 140, Steps 3 & 7)

315

Can a battery charger with a Boost fast-charge function be used as start support?

No. Do not use a charger unit with Boost function because electrical and ECU components could be destroyed by overvoltage. (Page 137, WARNING box)

316

What are common causes if the engine loses power/speed and emits black smoke?

Dirty air filter unit, faulty turbocharger or leaking intercooler/intake hoses, or malfunctioning fuel injectors. (Page 134, Table row 2)

317

What precautions must be observed during welding on the machine?

Disconnect the battery, connect the welding ground clamp as close as possible to the welding zone, and disconnect the plug connectors to the ECU and alternator voltage regulator. (Page 19, Paragraph 3)

318

What special fuel measure is required when storing the engine for 3 to 12 months?

Drain the tank until nearly empty, refill with FAME-free (biodiesel-free) diesel, and run the engine for a few minutes so only FAME-free fuel remains in the system. (Page 142, Step 1)

319

What are the permissible ambient storage conditions for the 4H50TIC?

Storage temperature between -25°C and +60°C, maximum relative humidity of 70%, and protected from direct sunlight. (Page 142, Paragraph 2)

320

Why might smoke appear briefly when a brand-new 4H50TIC is started for the very first time?

Exposed metal engine parts are factory coated with protective anti-corrosion wax that evaporates upon heating during initial startup. (Page 66, CAUTION box)

9
Section 9 · Questions 321–386

Size Specifications for Air Burners Incinerators FAQ

66 questions
321

What are the overall dimensions (L x W x H) of the S330 above-ground air curtain burner?

The overall size of the S330 is 40' 4" x 11' 10" x 9' 6".

322

What are the firebox dimensions (L x W x H) of the S330 air curtain burner?

The firebox dimensions for the S330 are 30' 2" x 8' 5" x 8' 1".

323

What is the total weight of the S330 air curtain burner?

The total weight of the S330 is 59,000 lbs..

324

What is the fuel consumption rate of the S330 air curtain burner in gallons per hour?

The fuel consumption rate of the S330 is 3.0 gal/hr..

325

What is the average throughput capacity of the S330 air curtain burner in tons per hour?

The average throughput capacity of the S330 is 11-13 tons/hr..

326

What are the complete technical specifications for the S330 above-ground air curtain burner?

For model S330: Overall Size: 40' 4" x 11' 10" x 9' 6"; Firebox Size: 30' 2" x 8' 5" x 8' 1"; Weight: 59,000 lbs.; Fuel Consumption: 3.0 gal/hr.; Average Throughput: 11-13 tons/hr..

327

What are the overall dimensions (L x W x H) of the S327 above-ground air curtain burner?

The overall size of the S327 is 37' 4" x 11' 10" x 9' 6".

328

What are the firebox dimensions (L x W x H) of the S327 air curtain burner?

The firebox dimensions for the S327 are 27' 2" x 8' 5" x 8' 1".

329

What is the total weight of the S327 air curtain burner?

The total weight of the S327 is 54,600 lbs..

330

What is the fuel consumption rate of the S327 air curtain burner in gallons per hour?

The fuel consumption rate of the S327 is 3.0 gal/hr..

331

What is the average throughput capacity of the S327 air curtain burner in tons per hour?

The average throughput capacity of the S327 is 9-11 tons/hr..

332

What are the complete technical specifications for the S327 above-ground air curtain burner?

For model S327: Overall Size: 37' 4" x 11' 10" x 9' 6"; Firebox Size: 27' 2" x 8' 5" x 8' 1"; Weight: 54,600 lbs.; Fuel Consumption: 3.0 gal/hr.; Average Throughput: 9-11 tons/hr..

333

What are the overall dimensions (L x W x H) of the S223 above-ground air curtain burner?

The overall size of the S223 is 33' 3" x 8' 6" x 8' 6".

334

What are the firebox dimensions (L x W x H) of the S223 air curtain burner?

The firebox dimensions for the S223 are 22' 11" x 6' 2" x 7' 1".

335

What is the total weight of the S223 air curtain burner?

The total weight of the S223 is 40,250 lbs..

336

What is the fuel consumption rate of the S223 air curtain burner in gallons per hour?

The fuel consumption rate of the S223 is 2.0 gal/hr..

337

What is the average throughput capacity of the S223 air curtain burner in tons per hour?

The average throughput capacity of the S223 is 7-9 tons/hr..

338

What are the complete technical specifications for the S223 above-ground air curtain burner?

For model S223: Overall Size: 33' 3" x 8' 6" x 8' 6"; Firebox Size: 22' 11" x 6' 2" x 7' 1"; Weight: 40,250 lbs.; Fuel Consumption: 2.0 gal/hr.; Average Throughput: 7-9 tons/hr..

339

What are the overall dimensions (L x W x H) of the S220 above-ground air curtain burner?

The overall size of the S220 is 30' 1" x 8' 6" x 8' 6".

340

What are the firebox dimensions (L x W x H) of the S220 air curtain burner?

The firebox dimensions for the S220 are 19' 8" x 6' 2" x 7' 1".

341

What is the total weight of the S220 air curtain burner?

The total weight of the S220 is 36,650 lbs..

342

What is the fuel consumption rate of the S220 air curtain burner in gallons per hour?

The fuel consumption rate of the S220 is 2.0 gal/hr..

343

What is the average throughput capacity of the S220 air curtain burner in tons per hour?

The average throughput capacity of the S220 is 5-7 tons/hr..

344

What are the complete technical specifications for the S220 above-ground air curtain burner?

For model S220: Overall Size: 30' 1" x 8' 6" x 8' 6"; Firebox Size: 19' 8" x 6' 2" x 7' 1"; Weight: 36,650 lbs.; Fuel Consumption: 2.0 gal/hr.; Average Throughput: 5-7 tons/hr..

345

What are the overall dimensions (L x W x H) of the S119 above-ground air curtain burner?

The overall size of the S119 is 27' 3" x 7' 2" x 7' 4".

346

What are the firebox dimensions (L x W x H) of the S119 air curtain burner?

The firebox dimensions for the S119 are 19' x 5' x 6'.

347

What is the total weight of the S119 air curtain burner?

The total weight of the S119 is 30,100 lbs..

348

What is the fuel consumption rate of the S119 air curtain burner in gallons per hour?

The fuel consumption rate of the S119 is 1.9 gal/hr..

349

What is the average throughput capacity of the S119 air curtain burner in tons per hour?

The average throughput capacity of the S119 is 3-5 tons/hr..

350

What are the complete technical specifications for the S119 above-ground air curtain burner?

For model S119: Overall Size: 27' 3" x 7' 2" x 7' 4"; Firebox Size: 19' x 5' x 6'; Weight: 30,100 lbs.; Fuel Consumption: 1.9 gal/hr.; Average Throughput: 3-5 tons/hr..

351

What are the overall dimensions (L x W x H) of the S119R** above-ground air curtain burner?

The overall size of the S119R** is 27' 6" x 7' 2" x 8' 3".

352

What are the firebox dimensions (L x W x H) of the S119R** air curtain burner?

The firebox dimensions for the S119R** are 19' x 5' x 6'.

353

What is the total weight of the S119R** air curtain burner?

The total weight of the S119R** is 39,900 lbs..

354

What is the fuel consumption rate of the S119R** air curtain burner in gallons per hour?

The fuel consumption rate of the S119R** is 1.9 gal/hr..

355

What is the average throughput capacity of the S119R** air curtain burner in tons per hour?

The average throughput capacity of the S119R** is 3-5 tons/hr..

356

What are the complete technical specifications for the S119R** above-ground air curtain burner?

For model S119R**: Overall Size: 27' 6" x 7' 2" x 8' 3"; Firebox Size: 19' x 5' x 6'; Weight: 39,900 lbs.; Fuel Consumption: 1.9 gal/hr.; Average Throughput: 3-5 tons/hr..

357

What are the overall dimensions (L x W x H) of the S116 above-ground air curtain burner?

The overall size of the S116 is 24' 7" x 7' 2" x 7' 4".

358

What are the firebox dimensions (L x W x H) of the S116 air curtain burner?

The firebox dimensions for the S116 are 16' x 5' x 6'.

359

What is the total weight of the S116 air curtain burner?

The total weight of the S116 is 27,500 lbs..

360

What is the fuel consumption rate of the S116 air curtain burner in gallons per hour?

The fuel consumption rate of the S116 is 1.9 gal/hr..

361

What is the average throughput capacity of the S116 air curtain burner in tons per hour?

The average throughput capacity of the S116 is 2-4 tons/hr..

362

What are the complete technical specifications for the S116 above-ground air curtain burner?

For model S116: Overall Size: 24' 7" x 7' 2" x 7' 4"; Firebox Size: 16' x 5' x 6'; Weight: 27,500 lbs.; Fuel Consumption: 1.9 gal/hr.; Average Throughput: 2-4 tons/hr..

363

What are the overall dimensions (L x W x H) of the S116R** above-ground air curtain burner?

The overall size of the S116R** is 24' 11" x 7' 2" x 8' 3".

364

What are the firebox dimensions (L x W x H) of the S116R** air curtain burner?

The firebox dimensions for the S116R** are 16' x 5' x 6'.

365

What is the total weight of the S116R** air curtain burner?

The total weight of the S116R** is 36,300 lbs..

366

What is the fuel consumption rate of the S116R** air curtain burner in gallons per hour?

The fuel consumption rate of the S116R** is 1.9 gal/hr..

367

What is the average throughput capacity of the S116R** air curtain burner in tons per hour?

The average throughput capacity of the S116R** is 2-4 tons/hr..

368

What are the complete technical specifications for the S116R** above-ground air curtain burner?

For model S116R**: Overall Size: 24' 11" x 7' 2" x 8' 3"; Firebox Size: 16' x 5' x 6'; Weight: 36,300 lbs.; Fuel Consumption: 1.9 gal/hr.; Average Throughput: 2-4 tons/hr..

369

What are the overall dimensions (L x W x H) of the T28 above-ground air curtain burner?

The overall size of the T28 is 17' 10" x 8' 5" x 5' 8".

370

What are the firebox dimensions (L x W x H) of the T28 air curtain burner?

The firebox dimensions for the T28 are 12' x 4' x 4'.

371

What is the total weight of the T28 air curtain burner?

The total weight of the T28 is 15,350 lbs..

372

What is the fuel consumption rate of the T28 air curtain burner in gallons per hour?

The fuel consumption rate of the T28 is 1.1 gal/hr..

373

What is the average throughput capacity of the T28 air curtain burner in tons per hour?

The average throughput capacity of the T28 is 1/2-1 tons/hr..

374

What are the complete technical specifications for the T28 above-ground air curtain burner?

For model T28: Overall Size: 17' 10" x 8' 5" x 5' 8"; Firebox Size: 12' x 4' x 4'; Weight: 15,350 lbs.; Fuel Consumption: 1.1 gal/hr.; Average Throughput: 1/2-1 tons/hr..

375

What are the overall dimensions (L x W x H) of the T26 above-ground air curtain burner?

The overall size of the T26 is 21' 8" x 7' 8" x 6' 8".

376

What are the firebox dimensions (L x W x H) of the T26 air curtain burner?

The firebox dimensions for the T26 are 12' x 4' x 4'.

377

What is the total weight of the T26 air curtain burner?

The total weight of the T26 is 17,500 lbs..

378

What is the fuel consumption rate of the T26 air curtain burner in gallons per hour?

The fuel consumption rate of the T26 is 1.1 gal/hr..

379

What is the average throughput capacity of the T26 air curtain burner in tons per hour?

The average throughput capacity of the T26 is 1/2-1 tons/hr..

380

What are the complete technical specifications for the T26 above-ground air curtain burner?

For model T26: Overall Size: 21' 8" x 7' 8" x 6' 8"; Firebox Size: 12' x 4' x 4'; Weight: 17,500 lbs.; Fuel Consumption: 1.1 gal/hr.; Average Throughput: 1/2-1 tons/hr..

381

What are the overall dimensions (L x W x H) of the T24 above-ground air curtain burner?

The overall size of the T24 is 19' 8" x 7' 8" x 5' 8".

382

What are the firebox dimensions (L x W x H) of the T24 air curtain burner?

The firebox dimensions for the T24 are 12' x 4' x 4'.

383

What is the total weight of the T24 air curtain burner?

The total weight of the T24 is 9,980 lbs..

384

What is the fuel consumption rate of the T24 air curtain burner in gallons per hour?

The fuel consumption rate of the T24 is 0.56 gal/hr..

385

What is the average throughput capacity of the T24 air curtain burner in tons per hour?

The average throughput capacity of the T24 is 1/2-1 tons/hr..

386

What are the complete technical specifications for the T24 above-ground air curtain burner?

For model T24: Overall Size: 19' 8" x 7' 8" x 5' 8"; Firebox Size: 12' x 4' x 4'; Weight: 9,980 lbs.; Fuel Consumption: 0.56 gal/hr.; Average Throughput: 1/2-1 tons/hr..

10
Section 10 · Questions 387–455

Kubota V3300

69 questions
387

Which Kubota engine models are covered in this workshop manual?

Kubota Diesel Engine models V3300-E2B (naturally aspirated) and V3300-T-E2B (turbocharged). (Page 153/Cover, Title; Page 155/To The Reader, Paragraph 1)

388

What does the 'E2B' designation signify in the Kubota V3300 engine model name?

E2B identifies engines designed to comply with Tier 2 / Phase 2 exhaust emission regulations, distinguishing them from earlier Tier 1 / Phase 1 engines. (Page 168/G-2, Section [2] 'E2B ENGINE', Paragraph 1-3)

389

Where is the engine model name and serial number located on the Kubota V3300?

It is stamped on the crankcase on the fuel injection pump side. (Page 167/G-1, Section [1], Diagram & Text)

390

How is the manufacturing date determined from the Kubota engine serial number?

The first character (number or letter) designates the year (e.g., 3=2003, 4=2004, D=2013), and the following letter designates the month and serial range (e.g., A=January for #0001-9999, B=January for #10000+). (Page 167-168/G-1 to G-2, Section [1], Tables & Example)

391

How are the cylinder numbers numbered on the Kubota V3300 engine?

Numbered No.1, No.2, No.3, and No.4 starting from the gear case (front) side towards the flywheel side. (Page 168/G-2, Section [3] 'CYLINDER NUMBER', Paragraph 1)

392

What is the firing order of the Kubota V3300 engine?

The firing order is 1-3-4-2. (Page 160/Specifications, Table row 'Firing Order')

393

What is the direction of engine rotation for the Kubota V3300?

Counter-clockwise when viewed from the flywheel side. (Page 160/Specifications, Table row 'Direction of Rotation')

394

What is the total displacement, bore, and stroke of the Kubota V3300 engine?

Bore x Stroke is 98 x 110 mm (3.86 x 4.33 in.), and total displacement is 3318 cm³ (202.53 cu.in.). (Page 160/Specifications, Table rows 'Bore x Stroke' and 'Total Displacement')

395

What are the SAE net continuous and intermittent power ratings for V3300-E2B and V3300-T-E2B?

V3300-E2B: Continuous 44.1 kW / 2600 rpm (59.1 HP), Intermittent 50.7 kW / 2600 rpm (68.0 HP). V3300-T-E2B: Continuous 53.8 kW / 2600 rpm (72.1 HP), Intermittent 61.9 kW / 2600 rpm (83.0 HP). (Page 160/Specifications, Table rows 'SAE Net Continuous' & 'SAE Net Intermittent')

396

What is the compression ratio of the V3300-E2B and V3300-T-E2B engines?

22.6 for the naturally aspirated V3300-E2B, and 21.8 for the turbocharged V3300-T-E2B. (Page 160/Specifications, Table row 'Compression Ratio')

397

What are the maximum and minimum bare idling speeds of the V3300 engine?

Maximum bare speed is 2800 rpm; minimum bare idling speed is 700 to 750 rpm. (Page 160/Specifications, Table rows 'Maximum' and 'Minimum Bare Idling Speed')

398

What is the dry weight of the Kubota V3300-E2B and V3300-T-E2B engines?

V3300-E2B weighs 241 kg (531 lbs); V3300-T-E2B weighs 250 kg (551 lbs). (Page 160/Specifications, Table row 'Weight (Dry)')

399

What are the overall dimensions (length, width, height) of the V3300-E2B and V3300-T-E2B?

V3300-E2B: Length 786.2 mm (30.95 in.), Width 563.5 mm (22.19 in.), Height 745 mm (29.33 in.). V3300-T-E2B: Length 786.2 mm (30.95 in.), Width 563.5 mm (22.19 in.), Height 793.2 mm (31.23 in.). (Page 163/Dimensions, Diagrams & Dimensions)

400

What combustion chamber design is used on the Kubota V3300 engine?

Spherical Type E-TVCS VERSION-II (Three-dimensional Environmental TVCS) with improved combustion surface at the top of the piston. (Page 160/Specifications, Table; Page 205/M-1, Para 2; Page 207/M-3, Section [4])

401

How many valves per cylinder does the Kubota V3300 engine have?

Three valves per cylinder: two intake valves with double ports and one exhaust valve. (Page 205/M-1, Para 2; Page 207/M-3, Section [3], Para 1)

402

What design features are employed on the cylinder block of the V3300?

Separate type crankcases: Crankcase 1 (hanger type containing combustion part) and Crankcase 2 (supporting Crankcase 1 and reducing noise). It is a linerless cylinder design for efficient cooling and wear resistance. (Page 206/M-2, Section [1], Para 1)

403

What is the purpose of the half-floating head cover on the V3300?

Rubber packing maintains the head cover approximately 0.5 mm off the cylinder head, dampening vibration and reducing noise coming from the cylinder head. (Page 206/M-2, Section [2], Para 1)

404

What type of piston rings are used on the Kubota V3300?

Top ring: nitrizing steel keystone ring; Second ring: chrome-plated peripheral undercut ring; Oil ring: chamfered contact faces with coil expander ring. (Page 207/M-3, Section [4], Para 3-4)

405

Why is a built-in dynamic balancer installed on the V3300 (balancer models)?

Four-cylinder engines produce secondary reciprocating inertia; the built-in balance shafts/weights absorb secondary inertia to reduce vibration. (Page 208/M-4, Section [5], Para 1-2)

406

How does the bottom bypass cooling system operate on the V3300?

When coolant temperature is low, the thermostat remains closed and coolant circulates through a bypass pipe. Once opening temperature is reached, the thermostat fully opens and closes off the bypass passage, forcing all coolant through the radiator. (Page 211/M-7, Section [2], Para 1-3)

407

What is the flow control thermostat and what problem does it eliminate?

It features a notched valve design to prevent coolant temperature hunting (severe cycles of overshoot and undershoot) by regulating coolant flowrate in small, smooth increments. (Page 210/M-6, Section [1], Para 1-4)

408

What type of fuel injection pump and governor does the Kubota V3300 use?

A Bosch type mini pump combined with a mechanical all-speed governor with a separate governor shaft that rotates at twice the speed of conventional shafts for rapid load response. (Page 160/Specifications, Table; Page 212/M-8, Section [1], Para 1-4)

409

What is the function of the boost compensator on the turbocharged V3300-T-E2B?

It senses turbocharger boost pressure to control fuel rack position, preventing fuel oversupply and transient black smoke during acceleration and low-boost operation. (Page 215/M-11, Section [1], Para 1-3)

410

What is the total lubricating oil capacity of the Kubota V3300 engine?

13.2 liters (3.49 U.S. gallons). (Page 160/Specifications, Table row 'Lubricating Oil Capacity'; Page 176/G-10, Table)

411

What API classification of engine oil is recommended for the V3300?

Class CF engine oil is recommended. Classes CD, CE, CF-4, and CG-4 can also be used depending on fuel sulfur content. (Page 160/Specifications, Table row 'Lubricating Oil'; Page 171/G-5, Table & Notes)

412

Which engine oil viscosity (SAE grade) should be selected based on ambient temperature?

Above 25°C (77°F): SAE30, SAE10W-30, or SAE10W-40. 0°C to 25°C (32°F to 77°F): SAE20, SAE10W-30, or SAE10W-40. Below 0°C (32°F): SAE10W, SAE10W-30, or SAE10W-40. (Page 176/G-10, Section 'Changing Engine Oil', Table)

413

What is the engine oil and oil filter change interval?

Initial change after 50 operating hours, then every 250 hours thereafter (or every 500 hours for filter cartridge under standard conditions). (Page 170/G-4, Maintenance Check List; Page 176/G-10; Page 177/G-11)

414

What is the factory specification and allowable limit for engine oil pressure?

At idle speed: factory specification / allowable limit is 49 kPa (0.5 kgf/cm², 7 psi). At rated speed: factory spec is 196 to 392 kPa (2.0 to 4.0 kgf/cm², 28 to 57 psi); allowable limit is 147.1 kPa (1.5 kgf/cm², 21.3 psi). (Page 228/S-10, Table 'LUBRICATING SYSTEM'; Page 234/S-16, Para 3)

415

What is the opening / working pressure of the engine oil pressure switch?

39.2 to 58.8 kPa (0.4 to 0.6 kgf/cm², 5.6 to 8.4 psi). (Page 228/S-10, Table 'LUBRICATING SYSTEM')

416

What is the relief valve cracking pressure in the lubrication system?

885 kPa (9.04 kgf/cm², 129 psi). (Page 228/S-10, Table 'LUBRICATING SYSTEM')

417

What are the thermostat valve opening and fully open temperatures?

Valve opening temperature: 74.5 to 78.5 °C (166.1 to 173.3 °F). Completely open temperature: 90 °C (194 °F). (Page 228/S-10, Table 'COOLING SYSTEM'; Page 235/S-17, Para 3-5)

418

What type and concentration of antifreeze should be used in the V3300?

Permanent Type (PT) long-life coolant (LLC). Mixing ratio must be less than 50% (40% protects to -24°C / -12°F; 50% protects to -34°C / -37°F). (Page 181/G-15, Section 'Anti-Freeze', Table & Notes)

419

What is the recommended fan belt deflection and checking procedure?

Deflection of 10.0 to 12.0 mm (0.394 to 0.472 in.) when pressed halfway between alternator and fan drive pulley at 98 N (10 kgf / 22 lbs). Checked every 250 hours. (Page 174/G-8, Section 'Fan Belt Tension'; Page 228/S-10; Page 234/S-16)

420

What pressure is used to test radiator water tightness and radiator cap leakage?

Radiator water tightness: test at 137 kPa (1.4 kgf/cm², 20 psi). Radiator cap air leakage: hold at 88 kPa (0.9 kgf/cm², 13 psi); pressure drop must not fall below 59 kPa (0.6 kgf/cm², 9 psi) in 10 seconds. (Page 228/S-10; Page 235-236/S-17 to S-18)

421

What type of fuel is specified for the Kubota V3300 engine?

Diesel Fuel No. 2-D (ASTM D975). (Page 160/Specifications, Table row 'Fuel')

422

What is the factory injection pressure for the V3300 fuel injection nozzle?

13.73 to 14.71 MPa (140 to 150 kgf/cm², 1991 to 2134 psi). (Page 160/Specifications, Table; Page 185/G-19; Page 229/S-11; Page 238/S-20)

423

How is the fuel injection nozzle opening pressure adjusted?

By changing the thickness of the adjusting washer inside the nozzle holder. A 0.01 mm (0.0004 in.) washer variation changes pressure by approx. 235 kPa (2.4 kgf/cm², 34 psi). (Page 185/G-19, Para 3 & Reference; Page 238/S-20)

424

How is injection nozzle valve seat tightness verified?

Apply 12.75 MPa (130 kgf/cm², 1849 psi) fuel pressure with a nozzle tester for 10 seconds; no fuel leakage should be observed. (Page 186/G-20, Para 2-3; Page 229/S-11; Page 239/S-21)

425

What is the factory fuel injection timing for V3300-E2B and V3300-T-E2B?

V3300-E2B: 0.20 to 0.22 rad (11.5° to 12.5°) before T.D.C. V3300-T-E2B: 0.11 to 0.13 rad (6.5° to 7.5°) before T.D.C. (Page 160/Specifications; Page 229/S-11; Page 237/S-19, Table)

426

How is the fuel system bled on the Kubota V3300?

Fill tank, loosen air vent coupling bolt on fuel filter until bubbles clear and retighten; open air vent cock on top of injection pump, run electric feed pump or crank engine for 10-15 seconds, then securely close the air vent cock. (Page 174/G-8, Section 'When bleeding fuel system')

427

How often should the fuel filter cartridge be replaced?

Every 500 operating hours. (Page 170/G-4, Maintenance Check List; Page 177/G-11, Section 'Replacing Fuel Filter Cartridge')

428

What is the cylinder compression pressure and allowable limit for V3300-E2B and V3300-T-E2B?

V3300-E2B: Factory spec is 4.32 MPa at 250 rpm (44 kgf/cm², 626 psi); allowable limit is 3.26 MPa at 250 rpm (33.2 kgf/cm², 472 psi). V3300-T-E2B: Factory spec is 3.92 MPa at 250 rpm (40 kgf/cm², 569 psi); allowable limit is 2.99 MPa at 250 rpm (30.5 kgf/cm², 434 psi). Cylinder variance must be <= 10%. (Page 223/S-5; Page 233/S-15)

429

What is the cold valve clearance specification for intake and exhaust valves?

0.23 to 0.27 mm (0.0091 to 0.0106 in.) for both intake and exhaust valves measured cold. (Page 179/G-13, Table 'Valve clearance'; Page 224/S-6)

430

What is the allowable limit for cylinder head surface flatness?

Allowable limit is 0.05 mm (0.0020 in.). (Page 223/S-5, Table 'ENGINE BODY')

431

What is the piston top clearance for V3300-E2B and V3300-T-E2B?

V3300-E2B: 0.72 to 0.90 mm (0.0283 to 0.0354 in.). V3300-T-E2B: 0.92 to 1.10 mm (0.0362 to 0.0433 in.). (Page 223/S-5, Table 'ENGINE BODY')

432

What are the standard cylinder bore diameter and oversize cylinder bore diameter?

Standard cylinder bore I.D.: 98.000 to 98.022 mm (3.8582 to 3.8591 in.), allowable limit 98.15 mm (3.8642 in.). Oversize bore I.D.: 98.500 to 98.522 mm (3.8780 to 3.8788 in.), allowable limit 98.65 mm (3.8839 in.). (Page 227/S-9, Table 'ENGINE BODY')

433

What is the crankshaft journal and crankpin diameter and their oil clearance limits?

Crankshaft journal O.D. is 74.977 to 74.990 mm (2.9518 to 2.9524 in.), oil clearance 0.018 to 0.062 mm (limit 0.20 mm). Crankpin O.D. is 52.977 to 52.990 mm (2.0857 to 2.0862 in.), oil clearance 0.018 to 0.051 mm (limit 0.20 mm). (Page 227/S-9, Table 'ENGINE BODY')

434

What are the factory specifications and allowable limits for piston ring end gap?

Compression ring 1 & 2: 0.30 to 0.45 mm (0.0118 to 0.0177 in.), allowable limit 1.25 mm (0.0492 in.). Oil ring: 0.25 to 0.45 mm (0.0098 to 0.0177 in.), allowable limit 1.25 mm (0.0492 in.). (Page 227/S-9, Table 'ENGINE BODY')

435

What is the allowable crankshaft side clearance (end play)?

Factory specification is 0.15 to 0.31 mm (0.0059 to 0.0122 in.); allowable limit is 0.50 mm (0.0197 in.). (Page 227/S-9, Table 'ENGINE BODY')

436

How is the proper replacement cylinder head gasket thickness selected?

By measuring average piston head protrusion or recess from the cylinder block deck with a dial indicator. Gaskets are identified by notch code: 2 notches (0.80 mm compressed), 1 notch (0.90 mm compressed), or without notch (0.95 mm compressed). (Page 249/S-31, Table 'Selecting the Cylinder Head Gasket')

437

What is the tightening torque for the cylinder head screws on the Kubota V3300?

98.1 to 107.9 N-m (10.0 to 11.0 kgf-m, 72.3 to 79.6 ft-lbs). Apply engine oil to threads and seating faces before tightening. (Page 231/S-13, Table [2]; Page 248/S-30)

438

What is the tightening torque for the connecting rod cap screws?

78.5 to 83.4 N-m (8.0 to 8.5 kgf-m, 57.9 to 61.5 ft-lbs). Apply engine oil to threads and seating faces. (Page 231/S-13, Table [2])

439

What is the tightening torque for the flywheel mounting screws?

98.1 to 107.9 N-m (10.0 to 11.0 kgf-m, 72.3 to 79.6 ft-lbs). Apply engine oil to threads and seating faces. (Page 231/S-13, Table [2])

440

What is the tightening torque for the crankshaft center bolt (crankshaft screw)?

255.0 to 274.6 N-m (26.0 to 28.0 kgf-m, 188.1 to 202.5 ft-lbs). Apply engine oil to threads and seating face. (Page 231/S-13, Table [2])

441

What is the tightening torque for the main bearing case screws?

137.3 to 147.1 N-m (14.0 to 15.0 kgf-m, 101.3 to 108.5 ft-lbs). Apply engine oil to threads and seats. (Page 231/S-13, Table [2])

442

What is the tightening torque for the fuel injection nozzle holder assembly?

49.0 to 68.6 N-m (5.0 to 7.0 kgf-m, 36.2 to 50.6 ft-lbs). (Page 231/S-13, Table [2]; Page 246/S-28)

443

What is the tightening torque for the glow plugs on the V3300?

19.6 to 24.5 N-m (2.0 to 2.5 kgf-m, 14.5 to 18.1 ft-lbs). (Page 231/S-13, Table [2]; Page 242/S-24)

444

What is the tightening torque for the rocker arm bracket screws?

49.0 to 55.9 N-m (5.0 to 5.7 kgf-m, 36.2 to 41.2 ft-lbs). (Page 231/S-13, Table [2]; Page 247/S-29)

445

What starter motor and battery ratings are standard on the Kubota V3300?

Starter: 12 V, 2.5 kW electric starting motor. Battery: 12 V, 112 AH. Charging alternator/dynamo: 12 V, 540 W. (Page 160/Specifications, Table rows 'Starting System', 'Battery', 'Dynamo for Charging')

446

What is the internal resistance of each glow plug on the Kubota V3300?

Approximately 1.0 ohm. (Page 229/S-11, Table 'ELECTRICAL SYSTEM'; Page 242/S-24, Section 'Glow Plug')

447

How do you test the dual-coil engine stop solenoid on the V3300?

Connect pulling coil (P terminal) and holding coil (H terminal) through separate switches to battery positive, with body grounded. When energized, plunger must pull in; holding coil keeps plunger in after pulling coil is deactivated. Never apply pulling current for longer than 2 seconds. (Page 242/S-24, Section 'Engine Stop Solenoid', Para 1-7 & IMPORTANT box)

448

What are the wear limits for starter brushes and commutator diameter?

Starter brush length: factory spec 18 mm (0.7086 in.), allowable limit 11 mm (0.4331 in.). Commutator O.D.: factory spec 32 mm (1.2598 in.), allowable limit 31.4 mm (1.2362 in.). Mica undercut limit: 0.2 mm (0.0079 in.). (Page 229/S-11, Table 'ELECTRICAL SYSTEM')

449

What specific gravity indicates a fully charged Kubota battery at 20°C (68°F)?

1.260 Sp.Gr. indicates 100% charged (1.230 = 75%, 1.200 = 50%, 1.110 = discharged). Recharge or replace if below 1.215 or if cells differ by more than 0.05. (Page 183/G-17; Page 240/S-22, Table 'Specific Gravity')

450

What are the probable causes if a Kubota V3300 engine produces black or dark gray exhaust smoke?

Engine overload, low grade fuel, clogged fuel filter, clogged air cleaner, or deficient nozzle injection. (Page 220/S-2, Table 'TROUBLESHOOTING')

451

What causes white or blue exhaust smoke on the V3300 engine?

Excessive engine oil in the crankcase, worn or stuck piston rings/cylinder, incorrect injection timing, clogged turbocharger waste oil pipe, or faulty turbocharger seal. (Page 220/S-2, Table 'TROUBLESHOOTING')

452

What causes fuel to mix into engine lubricating oil?

Oil dilution from defective seals/packing, worn injection pump plunger, defective injection nozzle, or broken injection pump body. (Page 221/S-3, Table 'TROUBLESHOOTING')

453

What critical precaution must be taken before removing the fuel injection pump unit?

Set No.4 piston to TDC compression, lock flywheel, lock the fuel camshaft by tightening upper and lower dog-point lock screws against the shaft without over-torquing, and scribe gear mesh align marks on idle gear 2. (Page 252/S-34, Section '(6) Injection Pump Unit', Steps 1-5)

454

How is the nozzle heat seal removed from the cylinder head?

Lightly drive a Phillips screwdriver (approx. 6 mm / 1/4 in. diameter) into the heat seal hole, turn 3-4 times each way, and pull the heat seal out together with the copper gasket. Always replace heat seal and gasket with new ones. (Page 246/S-28, Section 'Nozzle Heat Seal Service Removal Procedure', Steps 1-3)

455

In what orientation must the cooling fan be installed on the V3300?

Attach the cooling fan with its '1C010' marking facing frontward towards the radiator. (Page 245/S-27, Section 'Air Cleaner, Muffler and Others', IMPORTANT box)